Similar Projects
107 Wentworth Student Residence Renovation
Renovation
Post-Bid
$350,000 to $1,600,000 est. value
Charleston, SC 29401

RFP Construction Manager at Risk - Berry Residence Hall and Honors Program Renovation
Renovation
Post-Bid
$17,000,000 CJ est. value
Charleston, SC 29401

Pee Dee Rec Building 8177, Lower Floor Renovations
New Construction, Renovation, Infrastructure
Post-Bid
$150,000 CJ est. value
Florence, SC 29506

Chipley Hall Plaza Renovation
Demolition, Infrastructure, Renovation
Bidding
$560,000 CJ est. value
Greenwood, SC 29649

Design-Build Services - Renovate Two Buildings
Renovation - 62,000 SF
Post-Bid
$13,000,000 est. value
Clinton, SC 29325

Renovate West Annex Campus Dormitory Restrooms
Renovation
Bidding
$590,000 CJ est. value
Columbia, SC 29212

John De La Howe Residence Halls Renovation-Abatement
Term Contract, Infrastructure
Post-Bid
$75,000 CJ est. value
McCormick, SC 29835

Thornwell College Renovation - University of South Carolina
Renovation
Post-Bid
$9,250,000 CJ est. value
Columbia, SC 29208

Last Updated 01/12/2023 07:12 PM
Project Title

REBID President's House Maintenance Renovation Exterior Work

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $404,850 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Base bid includes repairs to cracking, a fluid applied elastomeric wall coating system, & removal & replacement of all exterior sealant joints at penetrations, terminations, transitions & fenestrations. Bidder shall submit bids in accordance of Hand Delivery or Mail service. Small & Minority business participation is highly encouraged. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document - $250,000 to $350,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents