Similar Projects
Shop Improvements - Foam Insulation, Lights & Heater
Alteration
Bidding
$25,000 to $100,000 est. value
Federal Dam, MN

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Facility HVAC Services
Post-Bid
Burnsville, MN

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Heritage Library Chiller Replacement
Post-Bid
Lakeville, MN 55044

Monroe Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Results
Anoka, MN

Inver Glen Library Chiller Replacement
Post-Bid
Inver Grove Heights, MN 55076

Hamilton Elementary School HVAC Replacement and Deferred Maintenance - Phase 1
Results
Coon Rapids, MN 55433

Maintenance and Repair for Chillers at Anoka Metro Regional Treatment Center
Term Contract
Post-Bid
$15,000 to $20,000 est. value
Anoka, MN 55303

2021 HVAC Unit Replacements at Savannah Oaks
Term Contract
Results
Ramsey, MN 55303

Insulating Services
Term Contract
Post-Bid
Moorhead, MN 56563

Reported 05/06/2022 12:00 AM
Project Title

Building Automation System Replacements and Integration

Physical Address View project details and contacts
City, State (County) Rochester, MN   (Olmsted County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this Contract.Building automation system (BAS) replacements in two buildings, a new supervisory energy management control system (EMCS), and integration of three existing buildings (including the two replacement BAS buildings) into the EMCS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents