Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Snowmobile Bridge Replacement Spring Valley Creek - Dane 15 Bridge
New Construction, Infrastructure
Bidding
New Glarus, WI 53574

Snowmobile Bridge Replacement Brewery Ditch - Dane 17 Bridge
New Construction, Infrastructure
Bidding
New Glarus, WI 53574

German Creek Bridge P-3-43 CTH M
Post-Bid
$300 est. value
WI

Rehabilitation of the West Cherry Street Bascule Bridge Over the Milwaukee River
Post-Bid
Milwaukee, WI 53202

State Street Lift Bridge - Balancing
Results
$100,000 to $300,000 est. value
Racine, WI 53403

Snowmobile Bridge Replacement Little Sugar River - Dane 16 Bridge
Results
New Glarus, WI 53574

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Snowmobile Bridge Replacement Spring Valley Creek - Dane 13 Bridge
New Construction, Infrastructure
Bidding
New Glarus, WI 53574

Twin Lake Road Bridge Replacement
Renovation, Infrastructure
Post-Bid
WI

Snowmobile Bridge Replacement Mount Vernon Creek - Dane 9 Bridge
Results
New Glarus, WI 53574

Spring Creek Bridge
New Construction, Infrastructure
Post-Bid
WI 54949

890th Street - Cth S, Popple Creek Bridge
Results
WI

2021 Colley Road and Stateline Road Bridge Deck Sealing
New Construction, Infrastructure
Post-Bid
Beloit, WI 53511

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

Last Updated 09/30/2021 08:23 AM
Project Title

Arboretum Bridge Replacements

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54311   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of demolishing, removing, reparing, and replacing six existing pedestrian bridges on the UWGB campus within the Cofrin Arboretum. Three bridges are to be demolished and replaced with new pre assembled structures, two bridges are to be razed and not replaced, and one bridge is to be repaired. The work also includes demolition and removal of existing structures, installing helical piles, grading, placing riprap, erosion control, restoration, and various bridge repairs

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents