Similar Projects
Last Updated | 09/30/2021 08:23 AM |
Project Title | Arboretum Bridge Replacements |
Physical Address | View project details and contacts |
City, State (County) | Green Bay, WI 54311 (Brown County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $185,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of demolishing, removing, reparing, and replacing six existing pedestrian bridges on the UWGB campus within the Cofrin Arboretum. Three bridges are to be demolished and replaced with new pre assembled structures, two bridges are to be razed and not replaced, and one bridge is to be repaired. The work also includes demolition and removal of existing structures, installing helical piles, grading, placing riprap, erosion control, restoration, and various bridge repairs |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |