Similar Projects
Y--Zion-New Water System at Kolob Canyons
Design
$1,000,000 to $5,000,000 est. value
Denver, CO

Pilot Lode Water Storage Tank Renovation
Renovation
Bidding
Keystone, CO

DOVE Compliance Improvements
Post-Bid
Victor, CO

J099-- Underground Storage Tank Repair Services -554
Post-Bid
Aurora, CO 80045

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

Potable Water Storage Tank Cleaning and Comprehensive Inspection
Results
Steamboat Springs, CO 80477

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs
Post-Bid

Construction Services for 2.0MG Elevated Tank
Results
Brighton, CO 80601

Water Tank Cleaning and Inspection
Post-Bid
Canon City, CO

Water Storage Tank Renovation Project
Results
Sterling, CO 80751

Water Treatment Process Tank and Apparatus Repair
Post-Bid
Arvada, CO

Replace B590 Storage Tanks, Peterson AFB
Results
Colorado Springs, CO

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Expansion Tank Bladder Replacement
Results
Less than $8,000 est. value
Westminster, CO 80031

On Call Tank and Monitoring Services
Post-Bid
CO

Reported 10/01/2021 12:00 AM
Project Title

South Water Tank Water Distribution System

Physical Address View project details and contacts
City, State (County) Johnstown, CO   (Larimer County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing and installing approximately 37,300 LF of 16-inch C905 (DR 18) PVC pipeline, 12” and 16” fittings, isolation valves, 2 air relief valves, 40 fire hydrants, pipe restraints, one HDD river crossing, four bored canal crossings, two tunneled railroad crossings, two county road crossings, and related work in conjunction with construction of the Town’s new South Water Tank. Work is divided into two schedules. Schedule A includes all pipeline work not located in Colorado Boulevard. Schedule B reflects all work along Colorado Boulevard. Two PRV stations are also included as additive alternates.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents