Similar Projects
Beaverdam Radiator and Other Components Replacement
Post-Bid
Mechanicsville, VA 23111

Provide and Install Hot Water Heater
Post-Bid
Hudgins, VA 23076

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

Science Building Lab Exhaust Ductwork Repairs at Lord Fairfax Community College
Results
Middletown, VA

Cold Storage Unit Replacement
Post-Bid
Abingdon, VA

Z--TIERED EVALUTIONS Renovate for Water Quality
Results
$2,000,000 to $5,000,000 est. value
Salem, VA 241536404

C1DA--A-E Upgrade Replace HVAC Phase II (VA-20-00029490)
Post-Bid
$150,000 est. value
Salem, VA 24153

HVAC Improvement Main Terminal First Floor
Results
Richmond, VA 23250

Voter Registrar Office Tenant Upfit Equipment - HVAC Equipment
Post-Bid
VA

HVAC Repair and Maintenance Services for Various Town Facilities
Results
Purcellville, VA 20132

Air Cooler Chiller Replacement
Post-Bid
Manassas Park, VA 20111

Trani Roof Repair and HVAC Replacement
Results
Richmond, VA 23220

Cooling Tower Replacement
Post-Bid
Yorktown, VA

Modern Green High-Efficiency HVAC System
Results
Richmond, VA

Replacement/Refurbishment Datacenter AHU #1 and #3
Post-Bid
Radford, VA 24143

Last Updated 08/17/2021 11:54 AM
Project Title

HVAC Upgrades for the Bland County Courthouse

Physical Address View project details and contacts
City, State (County) Bland, VA   (Bland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide heating and cooling solutions for the Bland County Courthouse. The scope of this work is to provide comfortable, controllable, conditioned air within the Courthouse, by possibly reducing/removing dependency of the fuel fired water boiler (1), fuel fired domestic water heater (1), and chiller unit (1); replacement of fan coil units (43), make up air unit (1) and any/all cold/hot water piping associated with existing HVAC system. If removal of existing equipment is not feasible, then other solutions to provide comfortable, controllable, conditioned air will be entertained.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents