Similar Projects
Water Supply Plant - Phase 1 to Serve Brazoria County Municipal Utility District No. 87
Renovation
Bidding
$300,000 CJ est. value
Brazoria, TX 77422

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Valencia Section 5
Infrastructure
Bidding
$500,000 CJ est. value
Brazoria, TX 77422

Plumbing Services, Lufkin State Supported Living Center
Term Contract
Sub-Bidding
Pollok, TX 75969

Plumbing, Parts, Supplies and Related Services
Term Contract
Sub-Bidding
Irving, TX 75061

Two Fountains at Farmers Branch Manske Library
Alteration
Post-Bid
Farmers Branch, TX 75234

Replace 2 Wilkins 2" Double Check Valves
Alteration
Post-Bid
TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Solenoid Valve
Alteration
Post-Bid
San Antonio, TX 78212

Clemens Unit: Replace Structural Floor and Plumbing System - B Building Wings C and D
Results
$2,389,331 est. value
Brazoria, TX 77422

City Hall Front Water Fountain Cleaning, Maintenance, and Repair
Term Contract
Post-Bid
Dallas, TX 75254

Facility Maintenance Plumbing Services
Term Contract
Results
College Station, TX

Phillips Event Center Plumbing
Alteration
Post-Bid
Bryan, TX 77802

Plumbing System Maintenance and Related Services
Term Contract
Results
Los Fresnos, TX

Plumbing Services
Term Contract
Post-Bid
Dallas, TX

Last Updated 12/13/2022 02:04 PM
Project Title

Fort Bend County MUD No. 58 Permanent Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Richmond, TX 77469   (Fort Bend County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $12,305,910 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of all material, equipment, labor and supervision necessary or incidental to "Construction of Permanent Wastewater Treatment Plant for Fort Bend County MUD No. 58, Fort Bend County, Texas." TPDES NO. WQ0014520001 Scope of Work includes: Contractor to furnish all materials, labor and equipment for construction of a proposed 1.20 million gallons per day (MGD) permanent concrete wastewater treatment facility including demolition of existing 1.08 MGD steel wastewater treatment plant. Construction to include but not limited to: Excavation, installation and backfill of one (1) reinforced concrete entrance box with overflow box and screening, two (2) reinforced concrete aeration basins with aeration equipment, one (1) reinforced concrete entrance and exit channels, one (1) reinforced concrete splitter box, two (2) reinforced concrete clarifiers, two (2) reinforced concrete digester basins with associating decant, sludge piping, and aeration equipment, two (2) reinforced concrete chlorine contact basins with aeration equipment, entrance box, effluent v-notch weir, non-potable water pumps, one (1) Sludge Pump Station with foundation pad, four (4) centrifugal pumps, RAS/WAS meter, one (1) Scum Pump Station include foundation, two (2) submersible pumps, three (3) centrifugal blowers with foundation pad and shelter canopy, existing chemical storage shelter canopy, and all required appurtenances. Complete in Place. Site work to include but not limited to: Demolition as indicated in the plans, temporary reroute existing 24" effluent RCP pipe to outfall manhole, site filling, site grading/drainage, site restoration, concrete driveway, sidewalks, bollards, yard piping, remove and replace outfall manhole, install caps as indicated in the plans, inlets, MCC building, headworks relocation, lift station MCC relocation, two (2) automatic slide gates, Intermittent by-pass pumping will be required during various stages of work to be furnished and operated by the contractor, electrical work, and all required appurtenances. Complete in Place. Bids received after the closing time will be returned unopened. A cashiers check or bid bond in the amount of 2% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents