Similar Projects
Murphy Express #8600 / Lubbock
New Construction, Infrastructure - 2,824 SF
Design
$2,500,000 CJ est. value
Lubbock, TX 79423

Ricky Green Shop
New Construction, Infrastructure - 6,100 SF
Design
$350,000 CJ est. value
Lubbock, TX 79423

Bicycle and Pedestrian Improvements
Infrastructure
Bidding
$1,091,002 CJ est. value
Lubbock, TX 79403

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

14th Street Plaza and East Green Project
New Construction, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Lubbock, TX 79401

Shallowater Pump Station and Irrigation Improvements
Infrastructure
Results
$300,000 CJ est. value
Shallowater, TX 79363

SCADA System Improvements
Infrastructure
Results
$106,210 CJ est. value
Idalou, TX 79329

Toot' n Totum / Lubbock
New Construction, Infrastructure - 10,994 SF
Construction
$8,000,000 CJ est. value
Lubbock, TX 79404

Texas Tech University Academic Sciences Building - Bid Package #2
Renovation, Infrastructure
Construction
$5,000,000 CJ est. value
Lubbock, TX 79410

Leprino Foods Co Cheese Processing Plant / Lubbock
New Construction, Infrastructure - 850,000 SF
Pending Verification
$870,000,000 CJ est. value
Lubbock, TX 79403

Oakridge Leasing Office New Building
Demolition, New Construction, Infrastructure - 2,112 SF
Pending Verification
$400,000 CJ est. value
Lubbock, TX 79424

Southwest Garden Office Complex
New Construction, Infrastructure
Design
$2,260,000 CJ est. value
Lubbock, TX 79424

Lowes Canopy Addition / Lubbock
Addition, Infrastructure - 3,800 SF
Post-Bid
$1,000,000 CJ est. value
Lubbock, TX 79424

Asphalt Patching
Infrastructure
Results
$1,452,300 CJ est. value
Lubbock, TX 79401

Kelsey Park Garden Office Tract C
New Construction, Infrastructure - 4,840 SF
Construction
$1,210,000 CJ est. value
Lubbock, TX 79423

Last Updated 09/27/2023 12:18 PM
Project Title

Playa Lake 054 Lateral Extension - 2020060 - City of Lubbock

Physical Address View project details and contacts
City, State (County) Lubbock, TX 79401   (Lubbock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Funds will be used in FY 2 021-22 for Playa Lake 054 (Blue Sky Lake) Lateral Connection design, plans, specifications, and construction estimates for the extension of a lateral connecting Lake 054 to the trunk line installed with the Northwest Drainage Improvement Projects. Start Date Design: 12/1/2 021 Bid for Construction: 1 0/1/2 023 Completion of Project: 9/3 0/2 024 Project Justification Lake 054 is a non-overflow playa located at the southern edge of the Arnett Benson neighborhood between System C and System D of the City of Lubbock playa lakes. With increased development in the watershed and the focus of providing flood protection for Arnett Benson through the Northwest Lubbock Drainage Improvements Projects, the feasibility analysis determined that a lateral for Lake 054 is feasible to restore capacity to the playa between storm events. The areas have been historically flood prone, affecting residential and commercial structures. Numerous studies conducted since the early 199 0s evaluated possibilities for reducing the flood risks in the area. Results of the Maxey Park Feasibility Study were presented to the City Council in January 2 005 and prompted the Northwest Lubbock and Maxey Park Study, which was completed in 2 008. Design, plans, specifications, and construction estimates for the construction of storm water infrastructure from Maxey Park to the Canyon Lakes, as well as upstream detention to relieve some flooding risks to homes along Quaker Avenue between 5 0th Street and 34th Street. Feasibility of adding the Lake 054 lateral was evaluated during the design of Phase 3 improvements in 2 019. This project is in included in the City of Lubbock 2021-2026 Capital Improvement Plan (CIP). As of September 27, 2023, further details regarding have not been identified. A tentative bid schedule for contractors is scheduled for Fall 2023 with construction slated to begin first quarter of 2024; however, the firm timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents