Similar Projects
Forest Hills Park Pumping Station - 1001953 - City Of Tampa
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Tampa, FL 33612

18th Street Pumping Station Rehabilitation - City of Tampa
Renovation
Conception
$5,265,000 CJ est. value
Tampa, FL 33612

Chinaberry Booster Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$1,640,000 CJ est. value
Tampa, FL 33637

Construction, Flow Diversion from Falkenburg AWTP to Valrico AWTP
New Construction
Post-Bid
$18,863,000 est. value
Valrico, FL 33594

DSSC Building Interior Planter Infill Tennis Center Lift Station
Renovation
Post-Bid
Tampa, FL 33614

Low Pressure Sewer System (LPSS) SCADA Equipment Installation and Monitoring
Renovation
Results
$1,575,000 CJ est. value
Tampa, FL 33602

Special Project For Lift Station Upgrades For Colson Elementary
Renovation
Results
Seffner, FL 33584

Capital Improvement - Hillsborough County
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Tampa, FL 33602

Balm Road Super Pump Station - C10314000 - Hillsborough County
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Riverview, FL 33579

Virginia Pump Station Rehabilitation
Renovation
Post-Bid
$1,120,000 est. value
Tampa, FL

Special Project for Lift Station Upgrades for Colson Elementary
Renovation
Results
$300,000 est. value
Seffner, FL 33584

Lift Station Sequoia - Construction - City of Temple Terrace
New Construction, Infrastructure
Conception
$250,000 CJ est. value
Temple Terrace, FL 33637

RFQ Contractor - Flow Diversion from Falkenburg AWTP to Valrico AWTP
New Construction, Infrastructure
Post-Bid
$18,863,000 CJ est. value
Valrico, FL 33594

Stormwater Remote Water Level Rainfall and Pump Station Monitoring Services
Renovation
Results
$2,000,000 est. value
Tampa, FL

Lift Station North Riverhills - Construction - City of Temple Terrace
New Construction, Infrastructure
Conception
$305,000 CJ est. value
Temple Terrace, FL 33617

Last Updated 09/19/2023 11:34 PM
Project Title

RFP D/B - Tampa Bay Desalination Facility Intake Connection Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Apollo Beach, FL 33572   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,117,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has selected a Design Builder. provide Design-Build services for the Tampa Bay Desalination Facility Intake Connection Improvements Phase 2 Project. This project includes the design, permitting, and construction of a new seawater intake pump station, electrical building, 54-inch diameter fiberglass reinforced plastic piping and associated appurtenances for Tampa Bay Water's Desalination Facility located on Tampa Electric Company's (TECO) Big Bend Power Plant site. Tampa Bay Water's intent in developing this Request for Proposals is to encourage qualified firms to provide the best solution for the Project within the parameters of Tampa Bay Water's requirements as described herein and consistent with the project goals as described within the Basis of Design Report, Technical Specifications, and Part VI - Scope of Services. Tampa Bay Water expects to enter into an agreement utilizing its Construction Contract (Sample Attached) with a Design-Build entity for this Project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents