Similar Projects
Boiler Replacement
Alteration
Bidding
Coulterville, IL 62237

Boiler Refurbishment at Barrington High School
Alteration
Bidding
Arlington Heights, IL

East Moline Correctional Center Boiler Acid Wash
Post-Bid
East Moline, IL 61244

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Downers Grove, IL

Niles West Domestic Water Heater Replacement
Renovation
Results
Skokie, IL 60077

Building B Boiler Replacement Service
Results
Crystal Lake, IL 60012

CPS Gary ES Hot Water Heater Replacement
Alteration
Bidding
Chicago, IL

Abandoned Rooftop Equipment Removal
Post-Bid
Palatine, IL 60067

Water Heater Replacement
Results
Deerfield, IL 60015

Vienna HS Small Gym HVAC Replacement
Alteration
Bidding
Vienna, IL 62995

Repair Boilers
Post-Bid
$100,000 to $250,000 est. value
IL

Water Treatment Plant Boiler Replacement
Results
Hudson, IL 61748

Boiler Replacement
Alteration
Bidding
Coulterville, IL

DHS/Elgin MHC Refrigeration
Term Contract
Post-Bid
Elgin, IL 60123

Boiler Replacement at Dawes Elementary School Annex Building and Washington Elementary School Annex Building
Results
Evanston, IL 60202

Reported 06/11/2021 12:00 AM
Project Title

Boiler/Equipment Emergency Repairs

Physical Address View project details and contacts
City, State (County) Springfield, IL 62712   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing engineering, technical support, testing services, procurement and maintenance services for the emergency repairs to the Dallman #4 Boiler, and any equipment, duct, piping, etc repairs as assigned. The boiler include the following: a. Unit 4: 230MW Foster Wheeler opposed wall fired boiler with three 22.5 MBF pulverizers, TLT Covent (Howden) Submerged Chain Conveyor, SCR, baghouse, wet scrubber, wet electrostatic precipitator and a Toshiba Turbine with a Holtec Condenser, FW Contract 6511649200 b. Auxiliary equipment: Coal, limestone and gypsum conveyors, wet bottom ash sluice systems, dry flash conveyors, air quality control systems The Work includes but is not limited to: the repair of the boiler and/or process related equipment, such as, tube repairs, pad welding, dutchmen, slag tank/ash hopper repairs, refractory, valve installation, pulverizer repairs, air heater, duct repairs, expansion joint repair/replacement, air quality control system equipment, etc. The Services include but are not limited to: procurement of equipment or material as required and engineering/technical support on all boiler process related equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents