Similar Projects
Bugbee Senior Center Heat Pump Systems Phase 2
Bidding
Hartford, VT 05001

Mini-Split AC/Heat Pump, Ball Mountain Lake, Jamaica, VT and Townshend Lake, Townshend, VT
Post-Bid
$15,000 to $25,000 est. value
Jamaica, Townshend, VT 05353

Heating Contractors - Weatherization Program Services
Term Contract
Post-Bid
Bennington, Rutland, VT

Town Shed Chimney Replacement
Results
Barton, VT 05822

Municipal Building HVAC Retrofit Phase 1
Term Contract
Results
Barre, VT

Weatherization Program Services - Heating Contractors
Post-Bid
Addison, Chittenden, Franklin, Grand Isle, VT

Unit Vent Replacement - Rutland Town School
Results
Rutland, VT 05701

Heating Contractors for Weatherization Assistance Program
Post-Bid

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Town Buildings HVAC
Term Contract
Results
Colchester, VT

2020 Pellet Boiler Miller’s Run Elementary School
Post-Bid
Sheffield, VT 05866

Police Department Ventilation System
Results
White River Junction, VT 05001

Bugbee Senior Center Heat Pump System
Post-Bid
White River Junction, VT 05001

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Reported 05/03/2020 12:00 AM
Project Title

Renovations of HVAC in Dormitory Buildings

Physical Address View project details and contacts
City, State (County) Vergennes, VT 05491   (Addison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations of HVAC in Dormitory Building: Work includes installing new variable refrigerant flow air conditioning system in each building listed with wall hung or cassette type indoor units in dormitory rooms, offices, corridors, and lounges. Bathroom and laundry exhaust systems in the dormitory buildings shall be connected to a heat recovery units. - Phasing and Swing Space: Phase the project using the available vacant dormitory bed space as swing space. It is anticipated to require four phases with two buildings being in each phase.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents