Last Updated | 12/12/2022 01:02 PM |
Project Title | Capital Improvement Project Maintenance/Repairs 2023 |
Physical Address | View project details and contacts |
City, State (County) | Little Canada, MN 55117 (Ramsey County) |
Category(s) | Heavy and Highway, Sewer and Water, Single Trades |
Sub-Category(s) | Environmental, Maintenance, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $517,633 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: Multiple Sites Located in the Cities of Little Canada, Maplewood, Oakdale, and Woodbury Minnesota The Work includes, but is not limited to, mobilization and demobilization at multiple sites; installing erosion control BMPs in accordance with project SWPPP, including; silt fence, sediment logs, floatation silt curtain, inlet protection, erosion control construction entrances, control of water and/or dewatering as necessary to perform work; using mud mats for protection at access, removal of trees, stumps, vegetation, and debris; excavation/dredging/channel cleaning with off-site disposal to landfill of sediment/muck/vegetation from storm water detention ponds, channels, inlet pools, culvert ends; removal of sediment/muck/vegetation from storm water modular block paver basins with off-site disposal of materials, excavation trenching to place compacted clay material for pond anti-seepage improvement; placement of compacted clay fill and riprap to repair slope erosion; debris cleaning along and between slots of timber weirs; repair/replace riprap at inlet/outlet structures; removal and replacement of filter rock, fabric and plastic fencing; installation of storm sewer piping and inlet catch basins as part of a water quality treatment system; general site work; control of traffic at and around construction sites, site restoration/seeding with native seed mixes provided by Owner; installing erosion control blanket on all exposed soils. Clean-up of sites and removal/disposal of temporary erosion control BMPs at the completion of Work, all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and not guaranteed.if you have any questions. Partial sets of documents will not be issued. Bid security shall be furnished in the amount of 5% of the bid in accordance with the Instructions to Bidders. All Work shall be substantially complete by end of the day on June 30, 2023; the General Conditions not later than two (2) calendar weeks after the date for the Substantial Completion of the Work |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |