Similar Projects
Garbage and Recycling Collection Services
Term Contract
Design
Logan, UT 84321

demolition and installation of electrical lighting systems
Term Contract
Design
Price, UT 84501

Pest Control Spraying Contract
Term Contract
Post-Bid
Beaver, UT

MS4 Project
Term Contract
Post-Bid
Murray, UT 84107

Bear Lake Portable Restroom Services
Term Contract
Results
Salt Lake City, UT

HAZMAT 10 Drum Storage Container and Dispensing System
Term Contract
Post-Bid
Bluffdale, UT 84065

Box Creek Hand Thinning and Strip Felling
Term Contract
Post-Bid
Marysvale, UT 84750

Shooting Range Environmental Cleanings
Term Contract
Post-Bid
Salt Lake City, UT 84104

Parking Lot and Gutter Sweeping
Term Contract
Post-Bid
Clearfield, UT 84015

DFCM Construction -CPB FY23-25 State Capitol Complex Capital Improvement Projects-VBS CM/GC Selection
Term Contract
Post-Bid
$3,500,000 CJ est. value
Salt Lake City, UT 84111

Cook Canyon Bullhog - BLM (Re-solicitation)
Term Contract
Post-Bid
Salt Lake City, UT 84111

Advanced Metering Infrastructure (AMI)
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Murray, UT 84107

Aggregate Backfill Materials
Term Contract
Post-Bid
West Valley City, UT 84120

Cathodic Protection Service
Term Contract
Post-Bid
Sandy, UT 84092

Energized Line Clearance
Term Contract
Post-Bid
Kaysville, UT 84037

Last Updated 07/21/2023 01:13 PM
Project Title

Airport Backup Generator Replacement

Physical Address View project details and contacts
City, State (County) Brigham City, UT 84302   (Box Elder County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $64,474 [brand] Estimate
Plans Available from Civil Engineer - 04/20/23
Owner View project details and contacts
Architect View project details and contacts
Description

The right is reserved, as Brigham City Corporation may require, to reject any and all bids and to waive any informality in the bids received. Bid Bond. Guarantee will be required with each bid as a certified check on a solvent bank or a Bid Bond in the amount of five (5) % of the total amount of the bid, made payable to the Brigham City Corporation. All questions regarding the bid are to be directed to Cody Hunt, P.E. with Jviation, a Woolpert Company, 405 South Main St., Suite 950, Salt Lake City, Utah, 84111, (303) 524 3030, Fax: (303) 524- 3031, or email cody.hunt@woolpert.com. Performance & Payment Bond. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. The work involved will include the following: Schedule I - Replace Backup Generator for Airfield Lighting Construction for this project is expected to take 5 calendar days.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents