Similar Projects
Sierra Hall Renovation - California State University - Northridge
Renovation - 100,000 SF
Conception
$138,439,000 CJ est. value
Northridge, CA 91330

Faculty Staff Housing, Phase 2 - California State University - Northridge
New Construction, Infrastructure
Conception
$73,560,000 CJ est. value
Northridge, CA 91330

ArtCenter College of Design - Phase II
Demolition, New Construction, Infrastructure, Renovation
Design
$45,000,000 CJ est. value
Pasadena, CA 91103

Global Hispanic Serving Institution Equity Innovation Hub - Northridge Campus
Addition, Demolition, Infrastructure - 21,000 SF
Design
$34,784,000 CJ est. value
Los Angeles, CA 91325

Pavilion Renovation at the Liberal Arts Campus
Renovation
Bidding
$1,400,000 CJ est. value
Long Beach, CA 90808

RFP - Student Housing Construction Management Services
Term Contract
Bidding
$62,610,100 CJ est. value
Compton, CA 90220

Knudsen Hall Electrical Distribution/Panelboards Replacement
Renovation - 164,702 SF
Sub-Bidding
$350,000 CJ est. value
Los Angeles, CA 90095

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Los Angeles, CA 91401

CLA Tower And Registration Buildings Demolition Project
Demolition, Infrastructure
Results
$9,068,000 est. value
Pomona, CA 91768

Cosmetology Power Upgrade Project
Renovation
Results
$57,693 CJ est. value
Pasadena, CA 91106

El Camino Community College - Music Theater and Arts Complex
Demolition, New Construction, Infrastructure
Pending Verification
$22,386,000 CJ est. value
Torrance, CA 90503

Design and Media Arts Center - Los Angeles Trade Technical College
New Construction, Infrastructure - 80,000 SF
Pending Verification
$45,000,000 CJ est. value
Los Angeles, CA 90015

Matador Achievement Center - California State University, Northridge
Demolition, New Construction, Infrastructure - 66,700 SF
Conception
$29,664,000 CJ est. value
Northridge, CA 91330

Fine Arts Building B Partial Renovation at West Los Angeles College
Renovation - 13,500 SF
Design
$6,400,000 CJ est. value
Culver City, CA 90230

Last Updated 07/11/2023 08:38 AM
Project Title

Social and Behavioral Sciences Building Renovation and Code Compliance - California State University - Dominguez Hills

Physical Address View project details and contacts
City, State (County) Carson, CA 90747   (Los Angeles County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $21,553,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will renovate 34,900 ASF/55,300 GSF in the Social and Behavioral Sciences (#30) building, which was constructed in 1980, to meet health, safety, and other code issues. Programmatic upgrades will be made to the laboratories to meet changing technologies. The project will upgrade the HVAC and electrical systems and address ADA requirements. This project is currently in the California State University's FY 2023-2027 Capital Improvement Program. As of July 11, 2023, Further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

34,900 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents