Similar Projects
LDS Relief Society Building Restroom
Renovation, Addition
Post-Bid
Salt Lake City, UT 84150

Playground Equipment and Parts Contract-A Multi-Stage Bid
Term Contract
Post-Bid
UT

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

The Exchange Building B
New Construction - 126,138 SF
Construction
$10,000,000 CJ est. value
Salt Lake City, UT 84111

Memorial Park Pickleball Design/Build Project
Construction
Less than $415,000 est. value
Payson, UT

Kane County Restroom Facility
Post-Bid
Kanab, UT 84741

Hillcrest Park Improvement Project Phase 1 - Grading
Results
Providence, UT

Crosswinds 1 Wolf Hollow 1
Renovation
Construction
Spanish Fork, UT 84660

Tennis Court Resurfacing
Post-Bid
West Valley City, UT 84119

Rush Trail Extension Phase 1
Results
Less than $75,000 est. value
Draper, UT

Dog Area Renovation
Construction
UT

Elton Park Pickle Ball Courts
Post-Bid
Tooele, UT

Montview Park Restroom Expansion Project
Results
Cottonwood Heights, UT

Woodside Park Phase 2 Construction - Construction Manager at Risk
Construction
Park City, UT

Reported 08/22/2019 10:17 AM
Project Title

Box Elder High School Tennis Courts and Restroom

Physical Address View project details and contacts
City, State (County) Brigham City, UT 84302   (Box Elder County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Restroom/Bath House
Contracting Method
Project Status Construction Commenced 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of removal of existing synthetic turf field and replacement of new synthetic turf system, including preparation and finish grading prior to turf installation. Project may also contain miscellaneous repairPost-tension tennis courts and restroom facility at Box Elder High in Brigham City, Utah,
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents