Similar Projects
Parview Lift Station Rehabilitation
Renovation
Bidding
$5,000,000 est. value
Clarkston, MI

2022 Greenville Sewer Lift Station Repairs
Renovation
Bidding
$600,000 est. value
Greenville, MI 48838

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Pump Station Replacement
Post-Bid
Oscoda, MI

Fieldstone Golf Course Irrigation Pump Station Replacement
Results
Auburn Hills, MI 48326

Harvey Booster Station Pump 2 Rebuild
Results
Muskegon, MI 49442

Remote Station Upgrades
Renovation
Bidding
$1,300,000 est. value
Kalamazoo, MI

Brye Road Booster Station Improvements
New Construction
Post-Bid
Ludington, MI

Dort Pump Station Rehabilitation
Results
Flint, MI

C-Newberry Correctional Facility (NCF) Water Systems Repair/Replacement
Renovation, Infrastructure
Bidding
$600,000 est. value
Newberry, MI 49868

35th Street Pump Station Improvements
Renovation
Post-Bid
Comstock, MI

Bar Screen Upgrades St Louis Correctional Facility
Results
Saint Louis, MI 48880

Biddle Point Pump Station Improvements
Renovation
Post-Bid
$2,750,000 est. value
Mackinac Island, MI

Sanitary Lift Station Cathodic Protection
Results
Troy, MI

Walnut Lake #3 Pump Station Rehabilitation
Renovation
Post-Bid
$1,100,000 est. value
Oakland, MI

Last Updated 05/06/2022 09:18 AM
Project Title

Autumn Creek Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Washington, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of raising the existing hatch structures for both the wet well and valve vault, a new generator, located to avoid impacts from future flood waters (with an external power supply and two-way power control added to the generator), replacement of the existing control panels with a single, two-door stainless steel enclosure featuring an exterior mounted rain gauge, replacement of the existing sanitary pumps (provided by others, installed by the contractor), and regrading of the site (including pavement)

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents