Similar Projects
Construction Services for Well 3 at Water Treatment Plant 2
Infrastructure
Bidding
$750,000 est. value
Mount Dora, FL 32757

Berkley Road Water Treatment Plant - Well No. 3
Infrastructure
Bidding
Auburndale, FL 33823

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Wet Well Cleaning
Post-Bid
North Port, FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Bidding
$462,000,000 est. value
Winter Haven, FL

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

RAS Pump and Motor Replacement
Infrastructure
Bidding
Sarasota, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

Last Updated 04/12/2022 11:34 AM
Project Title

Fire Department Deep Well Installation

Physical Address View project details and contacts
City, State (County) Port Saint Joe, FL 32456   (Gulf County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of a 4-inch Limited Supply deep well complete with. Submerged 5 HP/90 GPM capacity motor/pump. Approximately 80-gallon galvanized tank or equivalent. Including seal, brass check valve, vent and miscellaneous parts and fittings necessary for a fully functioning well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents