Similar Projects
U-Haul Self-Storage Facility / Daphne
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Daphne, AL 36526

Smith Intermediate School Addition & Renovation - 2021 Bond - Cleburne Independent School
Addition, Infrastructure, Renovation
Design
$5,871,648 CJ est. value
Eufaula, AL 36027

Smith Intermediate School Addition & Renovation - 2021 Bond - Cleburne Independent School
Addition, Infrastructure, Renovation
Design
$5,871,648 CJ est. value
Eufaula, AL 36027

Site Demolition, Erosion Control, Clearing and Grubbing, Grading and Excavation, Parking Lot Construction
Infrastructure
Bidding
$160,000 CJ est. value
Wetumpka, AL 36092

Site Demolition, Erosion Control, Clearing and Grubbing, Grading and Excavation, Parking Lot Construction
Infrastructure
Bidding
$160,000 CJ est. value
Wetumpka, AL 36092

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

Striping and Related Traffic Control Markings for a Parking Lot at the Wetumpka Recreational Facility
Infrastructure
Post-Bid
Wetumpka, AL 36093

Roadway and Sewer Improvements
Infrastructure
Results
Oxford, AL 36203

Bituminous Surface Treatment With CRS-2 Asphalt Emulsion
Infrastructure
Results
AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Randy Owen Performance Center - Jacksonville State University
New Construction, Infrastructure - 60,000 SF
Pending Verification
$15,000,000 CJ est. value
Jacksonville, AL 36265

Randy Owen Performance Center - Jacksonville State University
New Construction, Infrastructure - 60,000 SF
Pending Verification
$15,000,000 CJ est. value
Jacksonville, AL 36265

Kinderkids Daycare
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Daphne, AL 36526

GOMESA-Windscape L.S. Force Main Extension
Infrastructure
Bidding
$700,000 CJ est. value
Daphne, AL 36526

Annual Paving
Infrastructure
Post-Bid
AL

Last Updated 01/18/2023 10:51 AM
Project Title

Training and Community Center

Physical Address View project details and contacts
City, State (County) Union Springs, AL 36089   (Bullock County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only. Official sets must be obtained from McKee and Associates The proposed project will include building construction, electrical systems, mechanical systems, utilities connections and parking lot construction. A certified check or Bid Bond payable to City of Union Springs in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's sealed proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the City or its Architect. All bidders shall show such evidence by clearly displaying their current license number on the outside of sealed envelope in which the proposal is delivered. The Contractor is advised that the contract time for this project is 365 calendar days in time and is being administered thru the City of Union Springs. A certificate of compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, Act 2011-535, as amended by ACT 2012-491, is required by all contractors. All bidders are required to be registered in the System for Award Management (SAM.gov). The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit, with its bid, security in the amount of, form of and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw its bid within ninety (90) days after the actual date of the opening thereof. The project will consist of comprehensive improvements to construct a 5,775 square foot Community Center along with utilities connection, grading and paving for the site along March Street in Union Springs, AL.

Details

5,775 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents