Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Design-Build Services for the Rockaway Line Long Term Flood Mitigation
Infrastructure
Bidding
$100,000,000 est. value
NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY

Replacement of Culverts at West Main Street and Grant Street
Post-Bid
Middletown, NY 10940

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

Extra Space Storage - Site Work
New Construction
Construction
$5,000,000 to $10,000,000 CJ est. value
Pearl River, NY 10965

2021 District Wide Renovations and Addition Contract No. GW.1 General Work Including Asbestos Abatement and Site Work
Infrastructure, Alteration
Bidding
$75,000 est. value
Tannersville, NY

Horizontal Directional Drilling - Term Construction Contract #6
Post-Bid
Rochester, NY

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Furnish 48 Diameter Steel Reinforced Polyethylene (SRPE) Pipe and Tee Sections
Infrastructure
Bidding
Rochester, NY

Partition Street Culvert Replacement over Quackenderry Creek
Post-Bid
Less than $755,000 est. value
Rensselaer, NY

Culvert Replacement Project - Hulbert Hollow Road over a Tributary low Road over a Tributary to Michigan Creek
Results
Spencer, NY 14883

FEMA Repairs from Flooding
Infrastructure
Bidding
$106,590 to $144,211 est. value
Orient, NY 11957

Reported 05/24/2022 12:00 AM
Project Title

Excavation and Below Grade Construction of the RH-034 Combined Sewer Overflow

Physical Address View project details and contacts
City, State (County) New York, NY   (New York County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected October 2022, Construction Completion Expected June 2027
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in New York, New York. Completed plans call for site work for a water / sewer project. Construction Management Services for the Excavation and Below Grade Construction of the RH-034 Combined Sewer Overflow Abatement Facility at the Gowanus Canal. Once construction begins, the CM Consultant shall be accountable for the project delivery during the project's Construction Phase and shall manage the construction contract work in accordance with BEDC's online project delivery system, with the goal of ensuring that the construction work is being performed in accordance with the construction contract documents. The CM Consultant shall cause its employees and Subconsultants to understand the construction schedule, including recently completed work and upcoming planned work. The CM Consultant shall work closely and collaboratively with DEP and the Design Engineer staff to coordinate engineering information throughout the Construction Phase. The CM Consultant shall implement sound principals of construction management, including all CMP requirements. Project Description The City of New York ("City") and the United States Environmental Protection Agency ("EPA") entered into an Administrative Settlement Agreement and Order for Remedial Design, Removal Action and Cost Recovery ("Settlement Agreement") for the Gowanus Canal Superfund site, effective June 9, 2016. The CSO abatement facility at the Gowanus Canal Outfall RH-034 is one of the selected remedial actionsin the Settlement Agreement and the work to construct this facility is divided into three phases. Further, the Administrative Order for Remedial Action, Removal Action and Design, (CERCLA 02-2021-2019), effective June 30, 2021, included construction milestones for CP-2 and subsequent work. Contracts CSO-GC-SFS-RH3-CP1 ("CP-1") and CSO-GC-SFS-RH3-CP1A ("CP-1A") are the first two phases and include abatement of regulated materials; demolition of structures to slab and/or grade, disconnection and/or demolition of utilities; and site preparations for turnover for the project site (CP-1) and construction staging area (CP-1A). This work will be concluding at the start of the CP-2 contract. Construction Management services for CP-1 and CP-1A are provided under separate contracts. CP-2 will include construction of the support of excavation; the excavation, stabilization, and disposal of soils; and construction of the foundation for the facility. Further, the scope of work for CP-2 consists of a groundwater/construction water treatment system; on-site slurry production; support of excavation (SOE) slurry T-wall panels installed approximately to 200 foot depth to bedrock to create a watertight "bathtub"; excavation, stabilization and off-site disposal of contaminated soils; subsurface structural construction (tie downs, base slab, tank walls, top slab); influent/effluent structures to/from tank to RH-034 regulator; and jet grout mat at base of influent/effluent structures. At the conclusion of the CP-2 contract, the site will be turned over to the contractor performing the CP-3 phase of work. CP-3 will include the construction of the above grade facility, including all mechanical, electrical, plumbing and HVAC components, and the construction of the public recreational space. This work will take place on two properties located at Block 411, Lot 24 and Block 418, Lot 1, bounded by the Gowanus Canal on the west side and Nevins Street on the east side, between Butler Street and Degraw Street in Brooklyn, NY. Additionally, Block 425, Lot 1 will be used by the contractor as the construction staging area.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents