Similar Projects
Paving Requirement
Term Contract
Post-Bid
Hill Air Force Base, UT - Boulder, WY

Dubois Airport-Apron Expansion
Infrastructure
Post-Bid
Dubois, WY 82513

Hunt Field
Term Contract
Post-Bid
$2,700,000 est. value
Lander, WY

RIW 053-054 Taxiway A, C1, and D Rehabilitation
Infrastructure
Post-Bid
$4,000,000 est. value
Riverton, WY 82501

D/B - North Big Horn County Airport U68-Install NAVAID - Runway 27 REILs
Infrastructure
Results
$200,000 est. value
Lovell, WY 82431

Reported 05/19/2022 12:00 AM
Project Title

Reconstruct Runway 9-27 (Phase III)

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $14,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include full depth PCC and asphalt pavement reconstruction, full depth PCC demolition, subsurface edge drains, runway and taxiway edge light installation, guidance sign installation, duct banks, PAPI infrastructure installation, and pavement markings.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents