Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

FA DAY Boiler Replacement and Related Equipment - General Bid
Bidding
Less than $738,000 est. value
Newton, MA 02460

Ball Hall Installation of Dampers
Bidding
Less than $65,000 est. value
Lowell, MA

Dual Media Replacement
Post-Bid
Lowell, MA

Replace Boiler 1 at Barracks 5230
Post-Bid
Less than $35,000 est. value
Hanscom A F B, MA

Replace Compactor Rail System at Bldg 1855
Results
Less than $25,000 est. value
Bedford, MA 01731

Community Room & Meeting Room Mechanical System Replacement, Brady Towers AMP-2
Results
$90,200 est. value
Somerville, MA 02143

Ditson School Boiler Replacement
Bidding
Billerica, MA 01821

Hot Water Heater Jackets and Pipe Insulation
Post-Bid
$22,000 est. value
Acton, MA

Micro Bulk Liquid Argon Gas System
Results
North Chelmsford, MA

Rmove Wak-In Cooler B1425
Post-Bid
Less than $25,000 est. value
Bedford, MA 01731

Forge Village Water Treatment Plant Media Replacement
Results
Less than $250,000 est. value
Westford, MA 01886

Country School Boiler Section Replacement - Remove and Replace 12 Sections of a Burnham V11 Boiler
Post-Bid
Less than $23,000 est. value
Weston, MA 02493

Boiler Replacement at the Butters Row Water Treatment Plant
Results
$75,000 est. value
Wilmington, MA

Heating System/Boiler Repair and Refrigeration/HVAC Repair
Term Contract
Post-Bid
Less than $35,000 est. value
North Reading, MA

Last Updated 01/08/2019 08:02 AM
Project Title

FMC Devens - Construct Freezer at Warehouse

Physical Address View project details and contacts
City, State (County) Ayer, MA 01432   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The contractor shall provide all equipment, materials and labor for the design, fabrication and installation of a free-standing drive-in freezer inside the FMC Devens warehouse building.
Details
Division 13 - Special Construction, Controlled Environment Rooms, Cold Storage Rooms, Walk-in Freezers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents