Similar Projects
Rohr Road Industrial Development
New Construction
Conception
Columbus, OH 43137

ILPEA Industries/OEM Miller
Addition - 32,680 SF
Conception
Aurora, OH

Self-Storage Facility
New Construction, Demolition - 203,000 SF
Design
Mayfield Heights, OH 44124

Avon International Commerce Park
New Construction - 120,000 SF
Design
$10,000,000 CJ est. value
Avon, OH 44011

River Bend Industrial Park
New Construction - 96,000 SF
Bidding
$9,000,000 to $10,000,000 est. value
Lorain, OH 44052

Ariss Park Service Building Project
New Construction - 1,200 SF
Bidding
$75,000 est. value
North Canton, OH 44720

Borgo Storage Facility
New Construction - 120,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Akron, OH 44312

Design of New Public Works Department Office / Garage Building
New Construction, Demolition - 5,420 SF
Post-Bid
Less than $1,225,000 est. value
Loveland, OH 45140

50 X 50 Pre-Engineered Steel, Cold Storage Building
Post-Bid
Sulphur Springs, OH

Columbus Dispatch 400 Ton Salt Storage Facility
Results
Less than $136,300 est. value
Blacklick, OH

Construction of a 40` X 70` X 20` All Steel Building
Results
Van Wert, OH

The Cubes at Etna West - Phase I
New Construction - 5,435,000 SF
Construction
$10,000,000 CJ est. value
Etna, OH 43018

FedEx Crossdock Facility
New Construction - 58,355 SF
Construction
$6,270,000 est. value
Green, OH 44720

Eastgate Commercial Park
New Construction - 160,680 SF
Pending Verification
$6,600,000 est. value
Gahanna, OH 43004

Warehouse Renovation
Renovation - 381,740 SF
Pending Verification
Parma, OH 44130

Reported 11/20/2020 10:39 AM
Project Title

Storage Unit Project

Physical Address View project details and contacts
City, State (County) Vermilion, OH 44089 (Erie, Lorain Counties)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents