Similar Projects
Plumbing Supplies
Bidding
Round Rock, TX 78681

Plumbing Systems Maintenance, Equipment, Parts and Services
Bidding
Seguin, TX 78155

Harbor Fountain Liner
Post-Bid
Rockwall, TX

Plumbing Services Citywide
Term Contract
Post-Bid
Dallas, TX 75201

Houston District Plumbing Maintenance and Repair Service
Results
Angleton, Conroe, Hempstead, Rosenberg, Sugar Land, TX 77515

Houston District Plumbing Maintenance and Repair Service
Results
Angleton, Conroe, Hempstead, Rosenberg, Sugar Land, TX 77515

Electronic Plumbing Control System at The Juvenile Justice Detention Center
Post-Bid
Houston, TX

South Campus Direct Pipe
Results
$10,000,000 est. value
Dallas, TX 75390

Plumbing Services (City of Laredo Municipal Housing )
Post-Bid
Laredo, TX 78041

Telford Unit: Replace Hot Water and Steam Piping
Results
New Boston, TX 75570

Austin Metro Plumbing Repair and Maintenance Services
Post-Bid
Austin, TX 78731

Plumbing Maintenance and Supplies for 2019-2020
Term Contract
Results
Tuscola, TX 79562

Plumbing Services and Repairs for Asset Management
Term Contract
Post-Bid
Corpus Christi, TX 78401

Mechanical, Electrical, and Plumbing (MEP) Systems Renovations at Mexia State Supported Living Center
Results
$2,089,000 est. value
Mexia, TX 76667

Plumbing Services and Repairs for CCIA
Term Contract
Post-Bid
Corpus Christi, TX 78406

Reported 11/13/2020 12:00 AM
Project Title

Main Kitchen Plumbing Drain Renovation

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,950,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work includes the replacement or renovation of kitchen floor drains, floor sinks and floor drain pipe. Wall construction, wall finish and floor tile repair are included in the scope. Scope notes 1. All new drain and vent pipe will be Stainless Steel 2. Heat trace will be installed for all new drain pipe 3. Heat Trace control panels will provide monitoring and control. The MD Anderson Building Automation System will monitor the heat trace. 4. Floor drains will require new floor cores 5. New drains will require to be fire sealed and protected per MD Anderson Specifications and Construction Document details.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents