Last Updated 03/04/2021 09:46 AM
Project Title

M-59 Water Main Extension

Physical Address View project details and contacts
City, State (County) Hartland, MI   (Livingston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water main installation (12" and 16") along M-59 and Cundy Road in Hartland Township, MI. Project contains 1,800 feet of DI water main (open cut) and 6,000 feet of HDPE water main (horizontal direction drill). Project requires a portion of the installation of DI water main to be on timber pile support. To construct WM, project also plans to reconstruct approximately 700 lineal feet of roadway using approximately 1040 tons of HMA, 30 syd of concrete driveway approach and 30 lineal feet of curb and gutter

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents