Similar Projects
Ferguson: Construct Water Well and Transmission Line
Bidding
TX 75852

Domestic Water Pump Replacement Project
Bidding
Fort Worth, TX

Repair/Recondition One 50,000 GPM Vertical Centrifugal Water Pump (P-203)
Post-Bid
Baytown, TX 77520

Water Well No. 2
Post-Bid
TX

Plugging Abandoned Water Well
Results
$1,320 est. value
Irving, TX

Repair and Install Variable Frequency Drive on Irrigation Well 8
Results
Bushland, TX 79012

Granger Pines WWTP Site Work and Wet Well
Post-Bid
Conroe, TX 77301

Water Well Facilities for Pinewood Trails
Results
Less than $2,389,444 est. value
Cleveland, TX 77327

Repair of Water Pump for Airport Department
Post-Bid
Laredo, TX 78043

Exploration Well
Results
$176,600 est. value
Bullard, TX 75757

Rehabilitation of Well No. 3A
Post-Bid
$125,000 est. value
Kilgore, TX 75662

Well Site No. 5 and No. 6 Improvements
Results
$578,500 est. value
White Settlement, TX 76108

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

City of Alice Test Drilling and Production Well Construction
Post-Bid
TX

Last Updated 02/24/2021 05:36 AM
Project Title

Water Well No. 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Water well has a surveyed depth of 973’, 16” casing from 0’ - 447’depth and a 10” liner & Screens from 447’ – 973’ depth. Basic Work in this project includes the following: 1. Performing well camera survey and providing report, 2. Removing and reinstalling existing pumping equipment and bail oil, 3. Performing bacteriological and well performance tests. Additional Work in this project includes the following: 1. Wire brush cleaning, Chemical agitation, Jetting/Vacuuming, with an additional camera survey after cleaning 2. Air lift debris 3. Swage well screen or liner and install 5-foot Stainless Steel Patch 4. Swage well screen or liner with out steel patch 5. Install section screwed Column pipe 6. Provide Airline with new water level Supplemental Work in this project includes the following: 1. Additional Wire brush cleaning 2. Additional Chemical agitation 3. Additional Jetting/vacuuming of well 4. Remove debris from well by Fishing tool

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents