Similar Projects
Waste Removal Services
Term Contract
Design
Cleveland, OH 44115

Mowing of the Side Ditches Within Miami Township for Calendar Year 2023
Term Contract
Design
Miamisburg, OH 45342

RFP - Roadway - General Engineering 2023
Term Contract
Bidding
Columbus, OH 43215

Calcium Hydroxide Slurry
Term Contract
Sub-Bidding
Celina, OH 45822

Liquid Chlorine
Term Contract
Sub-Bidding
Mineral Ridge, OH 44440

Roadside Mowing
Term Contract
Post-Bid
Wooster, OH 44691

Perform Pest Control Inspections
Alteration
Post-Bid
New Philadelphia, OH

Sewer Cleaning and Televising Project
Term Contract
Results
$204,033 CJ est. value
Hebron, OH 43025

Recycling Drop-Off and Recycling Transfer Station Services
Term Contract
Results
Jefferson, OH 44047

Micro Surface Sealing and Sealing
Infrastructure
Construction
$315,000 CJ est. value
Jackson, OH 45640

Snow Removal Around the Florence Township Firehall
Term Contract
Design
Edon, OH 43518

Street Tree Planting Phase 1 Neighborhood Economic Development Project
Term Contract
Sub-Bidding
Cincinnati, OH 45202

G-150 Removal and Land Application/Beneficial Reuse of Lime Residuals Sludge Lagoon F
Term Contract
Post-Bid
Weathersfield Township, OH 44446

2023 Asphalt Emulsion Products
Term Contract
Results
Bryan, OH 43506

2023 Tree Clearing Annual Contract Delaware County
Term Contract
Design
Delaware, OH 43015

Last Updated 07/19/2023 11:03 PM
Project Title

CE Facility and Equipment Support

Physical Address View project details and contacts
City, State (County) Wright Patterson AFB, OH 45433   (Greene County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $51,997,182 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jul 17, 2023 Contract Award Number: FA8601-23-D-0009 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FLZPT7T3Y968 Contractor Awarded Name: FRONTLINE KING GEORGE JV LLC Contractor Awarded Address: Silver Spring, MD 20906 USA Base and All Options Value (Total Contract Value): $51,997,182.89 Deliveries or Performance Delivery Procedures Commercial Vehicles All vehicles larger than a large pick-up truck are required to be inspected by the WrightPatterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following: 1. Step van/panel truck 2. Tractor/trailer, box and flatbed containing cargo 3. Tanker trucks 4. Box trucks 5. Tour buses 6. Garbage/recycled waste trucks 7. Concrete trucks/mixers, dump trucks 8. Cranes, recreational vehicles, petroleum tanker This inspection will be conducted at Gate 26A located off State Highway 235. The following are exemptions to vehicles utilizing the CVDG: 1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers' names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access. 2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A and B) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the VDG at the discretion of the installation entry controller Period of Performance From 01 Apr 2023 To 31 Mar 2028 A site visit is scheduled for 18 May 22. Reservations are required and are due no later than 13 May 22. Please see Attachment 12 of this solicitation for further details.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents