Similar Projects
Repair Northbound S.C. Phillips Parkway, CCAFS, FL
Design
Cape Canaveral, FL 329252206

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Resurface Roads
Renovation
Post-Bid
Brooksville, FL 34613

Design Build Push Button
Results

Design Build Push Button
Results

Reedy Creek Improvement District - World Drive Extension Construction Project
New Construction
Construction
Lake Buena Vista, Orlando, FL 32830

LPGA Boulevard Roadway Improvements
Construction
$400,000 est. value
Daytona Beach, FL 32114

Construction Manager at Risk Town-Wide Overhead Utility Undergrounding Phase 2 & 3 - South
Post-Bid
West Palm Beach, FL

Annual Asphalt Overlay
Term Contract
Results
Less than $1,000,000 est. value
Jupiter, FL

Improvements to Estero Boulevard - Segments 3 & 4 Project
Post-Bid
Fort Myers, FL

Windsor Avenue Roadway and Utility Improvements - Construction Phase Services
Results
West Palm Beach, FL

I-95 Express Lanes Phase 3B-2
Results
FL

Biscayne Trail Segment C - Hybrid/Mountain Bike Trail and Spurs Rest Area
Results
Less than $422,497 est. value
FL

Osprey Ridge & Eco Road Extension Project
Results
Less than $4,427,556 est. value
Jacksonville, FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

Reported 09/11/2019 12:00 AM
Project Title

County Road 162 Resurfacing Project

Physical Address View project details and contacts
City, State (County) FL   (Holmes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description This project primarily consists of the resurfacing of CR 162 in Holmes County from CR 173 to the Homes Creek Bridge for a total project length of 2.396 miles. Also included in this project is isolated roadway reconstruction consisting of excavation and roadway base placement. Clearing and grubbing along with minor drainage improvements consisting of pipe replacement and ditch grading is also included. This project also includes shoulder rework and grassing operations along with signing and thermoplastic pavement markings.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents