Similar Projects
2 Ton Split HVAC Units
Post-Bid
Less than $15,000 est. value
Beverly, MA

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Heating System Repairs at the Manchester-by-the-Sea Wastewater Treatment Plant (WWTF), Water Treatment Plant (WTP), Department of Public Works (DPW) Garage, and the Town Hall - General Bid
Results
Less than $800,000 est. value
Manchester-By-The-Se, MA

HVAC Kitchen Upgrade at Nantucket Elementary School
Results
Nantucket, MA 02554

Boiler, Chiller and Related Equipment Replacement - General Bids
Post-Bid
Less than $4,000,000 est. value
Springfield, MA 01103

Furnish and Install Mini Split AC Unit
Results
Boston, MA 02210

Framingham High School HVAC Upgrades - General Bids
Post-Bid
Framingham, MA 01702

HVAC Preventative Maintenance
Results
Taunton, MA 02780

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids
Post-Bid
Billerica, MA

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Town Hall HVAC - AC Condenser and Coil Replacements
Post-Bid
Less than $78,000 est. value
Westminster, MA 01473

MIS Data Center Air Conditioning Units Replacement
Results
Less than $510,000 est. value
Boston, MA 02129

East Campus Commons Air Handler
Post-Bid
Bridgewater, MA 02325

Solomon Building Boiler Replacement - General Bids
Results
Less than $1,000,000 est. value
Cambridge, MA 02138

Corrective Maintenance HVAC Systems Service
Term Contract
Post-Bid
Less than $700,000 est. value
Framingham, MA 01702

Reported 04/02/2020 12:00 AM
Project Title

HVAC Equipment Replacement and Repair MVY Airport Terminal

Physical Address View project details and contacts
City, State (County) West Tisbury, MA 02575   (Dukes County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement and repair of the Air Conditioning Condensing Units in the passenger Terminal Building (the “Project”), as follows: Phase 1: Replace Hot Water Coil on AHU #3, remove ceiling and obstructions Phase 2: Replace ACCU #5 and convert from R-22 to R-410, replace solenoid valve Phase 3: Replace ACCU #3 and convert from R-22 to R-410, check for leaks Phase 4: Locate and repair leaks on ACCU #7.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents