Reported | 06/18/2021 12:00 AM |
Project Title | Water Service Conversion from Rear Water Services to Front Water Services |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL (Miami-Dade County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $8,643,471 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The disconnection of existing water meters from the service water lines located in the rear and/or side of the properties and the connection of new water service lines from water meters located in front of the properties to the existing service connections at the rear and/or side of the residences. Trench excavation, placing a sand/fine gravel bed on the bottom of the trench for pipe bedding, furnishing and installing the new water service from the new water meter located in front of the property to the existing household potable water system connection point, which includes copper pipes, tubing, fittings, valves, PVC valve boxes, grounding system (where applicable) and the installation of the new vacuum breaker at each existing and new hose bibb; furnishing and installing backflow prevention devices where applicable, install all piping, fittings, valve box and accessories to connect irrigation meter/sub-meter where existing, performing pressure tests on the new water service pipe, flushing, disinfecting the new service line, disposing of super chlorinated water properly, backfilling and compacting the trench, cutting and plugging existing water service line(s) located inside of the property, removing and disposing of the existing water meter box, filling void (at the abandoned 1-inch wing style angle stop valve) with ready mix concrete to 2-inches above the existing and to be abandoned 1-inch wing style angle stop valve, placing top soil on top of concrete and laying sod as needed to cover area or the necessary material to match the existing condition at this location, performing final cleanup/restoration and landscaping of the disturbed areas to equal or better condition. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |