Similar Projects
Arrowwood Coulee Levee Repair
Term Contract
Design
$250,000 to $500,000 est. value
Pingree, ND 58476

Storm Drain Lining at Federal Courthouse
Term Contract
Design
$25,000 to $100,000 est. value
Fargo, ND 58102

Mouse River Enhanced Flood Protection Project Phase BU-1D
Infrastructure
Bidding
Burlington, ND

Structure Replacement - Box Culvert Replacement
Renovation, Infrastructure
Bidding
ND

McHenry Lateral A and McHenry Lateral B Improvements
Post-Bid
Bottineau, ND

Concrete or Metal Culverts
Post-Bid
Bottineau, ND

Paving and Street Lights, Box Culvert, and Watermain for 44th Avenue South (South 17th Street to East Side of Southend Drainway)
Results
Less than $746,508 est. value
Grand Forks, ND 58201

Southwest Regional Pond Phase 1
Results
Less than $6,195,466 est. value
Fargo, ND 58102

Fargo Moorhead Metropolitan Area Flood Risk Management Project
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Fargo, ND

Culverts
Term Contract
Bidding
ND

Culverts
Term Contract
Post-Bid
Stanley, ND

Camrud Improvement District No. 79
Results
$1,272,000 est. value
ND

Metal Culvert Pipe and Reinforced Concrete Pipe
Infrastructure
Bidding
ND

2021 Box Culvert
Post-Bid
ND

Drain 31 System Improvements
Results
$535,000 to $545,000 est. value
Grafton, ND

Last Updated 02/17/2022 02:45 PM
Project Title

Drain 81

Physical Address View project details and contacts
City, State (County) Cavalier, ND   (Pembina County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $781,945
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of approximately 111,846 cubic yards of common excavation, stripping 5,800 cu. yards, 312 feet of 24” diam. CMP, 500 feet of 30” diam. CMP, 50 feet of 36” diam. CMP, 50 feet of 42” diam. CMP, 50 feet of 48” diam. CMP, 292 feet of 81”x59” Arch CMP, 160 feet of 87”x63” Arch CMP, 196 feet of 95”x67” Arch CMP, 30 feet of 4’x10’ RCB, 898 cubic yards riprap, seeding and mulching of approximately 31 acres, and other incidentals.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents