Similar Projects
Roofing Supplies As Needed
Post-Bid
Albuquerque, NM

Roof Replacement
Post-Bid
Lordsburg, NM

Maxwell NWR Roof
Results
Less than $50,000 est. value
Maxwell, NM

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Repair and Maintenance
Post-Bid

Town Hall and Fire Station Roof Replacement
Results
Springer, NM 87747

Remove and Replace Roofs - Multiple Schools
Post-Bid
Laguna, Tohajiilee, NM 87026

Campus Wide Roof Repair
Results
Silver City, NM 88062

Job Order Contract - Roofing
Term Contract
Post-Bid
Clovis, NM

Roofing IDIQ- Plains Area - South
Results
$2,000 to $3,000,000 est. value

Roof Renovation Project
Post-Bid
NM 87034

DACC Alex Sanchez Roof Coatings
Results
Las Cruces, NM 88003

Roofing Contractor on Demand
Infrastructure
Post-Bid
Less than $1,000,000 est. value
Rio Rancho, NM

4070 DACC East Mesa Main Building PVC Overlay
Results
$250,000 to $300,000 est. value
Las Cruces, NM 88011

Sunrise Elementary School Partial Re-Roof - 2021
Alteration
Post-Bid
$475,000 est. value
Chaparral, NM 88081

Last Updated 03/25/2022 01:22 PM
Project Title

Z--BIE/Nmns/Fm/Install New TPO Roofing Exs

Physical Address View project details and contacts
City, State (County) Fort Wingate, NM   (McKinley County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract scope of work consists of the following discipline of re-roofing project shall comprise of a new mechanically attached, single-ply, white 60 mil TPO membrane over the existing roof. Wing D is approximately 27,100 square feet and wing E is approximately 27,400 square feet. Tapered insulation board shall have a minimum slope of 1/4-inch per foot and shall have an R-value of 30. All low surface areas where ponding occurs shall have crickets or tapered insulation installed to allow for positive drainage. Roofing membrane and flashing shall terminate on top of parapet wall and shall not be exposed to the outside stone wall surface. All new metal drip edge, gutters and downspouts shall be 24 gage pre-finished metal. Install flashing on pipe vents and curbs to meet a minimum of 6-inches height above roof top. Replace all air vents with new metal screened air vents. Install walk pads next to serviceable mechanical roof equipment and at roof edge access. A more detailed statement of work will be provided with solicitation package to all eligible contractors.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents