Similar Projects
Last Updated | 01/13/2021 10:03 AM |
Project Title | Longmeadow Parkway - C4 Tolling Infrastructure and Signing |
Physical Address | View project details and contacts |
City, State (County) | Algonquin, Barrington Hills, Carpentersville, Dahlgren, East Dundee, IL (Cook, Hamilton, Kane, McHenry Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is located in Kane County, in the Village of Algonquin, the Village of Carpentersville, the Village of Barrington Hills, and Dundee Township. The work to be performed under this contract consists of installation of tolling infrastructure including control building foundation, prefabricated control building, toll equipment gantries, advanced signing, conduit, and site restoration. PCC Sidewalk 5 Inch (554 Sq Ft), Structure Excavation (200 Cy), Concrete Structures (24.7 Cy), Protective Coat (62 Sy), Reinforcement Bars, Epoxy Coated ( 3600 Lb), Sign Panel Type 1 ( 242 Sf), Sign Panel Type 2 (59 Sf), Sign Panel Type 3 (2401 Sf), Structural Steel Sign Support - Breakaway (18111 Lb), Metal Post Type a (747 Ft), Wood Sign Support (49 Foot), Overhead Sign Structure - Span, Type 1-a (176 Ft), Concrete Foundations (40.2 Cy), Drilled Shaft Concrete Foundations (42.2 Cy), Underground Conduit Pvc 2" (100 Ft), Underground Conduit Coilable Nonmetallic 3" (800 Ft), Prefabricated Fontrol Building (1 Ls); Etc. The signage work shall be completed by August 31, 2021. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |