Similar Projects
Water Tank Rehab and Painting (500,000 Gallon Elevated Structure and 1,000,000 Gallon Ground Storage Unit)
Infrastructure
Bidding
$600,000 CJ est. value
Fulton, MO 65251

Pavement Repair
Infrastructure
Bidding
$2,500,000 CJ est. value
Kingdom City, MO 65262

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

CR 304 Overlay Project
Infrastructure
Post-Bid
Fulton, MO

Asphalt Contractors
Infrastructure
Results
Fulton, MO

CR 304 Reclamation Project
Infrastructure
Results
MO

Resurface, Pavement Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Fulton, MO 65251

Purchase of Property and Demolition of Unsafe Structures
Demolition
Post-Bid
Fulton, MO 65251

Design and Build Services Adams Street
Infrastructure
Results
Jefferson City, MO

Whetstone Creek CA - Big Lake Spillway Structure Replacement
Infrastructure
Bidding
$450,000 CJ est. value
Williamsburg, MO 63388

Callaway County Replacement Bridge No. 4440016
New Construction, Infrastructure
Post-Bid
Fulton, MO

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Resurface From Route B
Infrastructure
Results
$10,000,000 to $15,000,000 est. value

Road Bores for I-70 and County Road 269
Infrastructure
Post-Bid
MO

Last Updated 09/08/2022 10:31 PM
Project Title

City of Fulton Bridge Replacement

Physical Address View project details and contacts
City, State (County) Fulton, MO 65251   (Callaway County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,477,399 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Bids Shall Be Submitted as a Hard Copy. The Proposed Work Includes: Construction of an 80-foot Single Span Prestressed Concrete Adjacent Box Beam Bridge Using Accelerated Bridge Construction Technologies, Approach Roadway Work, Sidewalk Improvements, and Any Incidental Work in Accordance With the Plans and Specifications. The Project Is Located on 2nd Street, in Section 16, Township 47 N, Range 9 W, City of Fulton in Callaway County, Missouri, Over Stinson Creek. All Labor Used in the Construction of This Public Improvement Shall Be Paid a Wage No Less Than the Prevailing Hourly Rate of Wages of Work of a Similar Character in This Locality as Established by the United States Department of Labor (Federal Wage Rate), or by the Missouri Department of Labor and Industrial Relations (State Wage Rate), Whichever Is Higher. The City of Fulton Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Businesses Owned and Controlled by Socially and Economically Disadvantaged Individuals Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. All Bidders Must Be on Modot's Qualified Contractor List Per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2021, Third Edition Including All Revisions. The Contractor Questionnaire Must Be on File 7 Days Prior to Bid Opening. Contractors and Sub-contractors Who Sign a Contract to Work on Public Works Projects Shall Provide a 10-hour Osha Construction Safety Program, or Similar Program Approved by the Department of Labor and Industrial Relations, to Be Completed by Their on-site Employees Within Sixty (60) Days of Beginning Work on the Construction Project. A Certified Cashier's Check or a Bid Bond in the Amount of 5% Shall Be Submitted With Each Proposal. The City of Fulton Reserves the Right to Reject Any or All Bids. The Project Will Be Awarded to the Lowest, Responsive, Responsible Bidder. The Dbe Goal for This Project Is 8%. No 2nd Tier Subcontracting Will Be Allowed on This Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents