Similar Projects
Mississippi River Basin, Lock 19, Keokuk, Iowa, Plc And Hydraulic Cylinders
Renovation
Design
$1,000,000 to $5,000,000 est. value
Keokuk, IA 52632

Kirkwood Community College - Kirkwood Animal Health Building
New Construction
Bidding
Cedar Rapids, IA

Winnebago River Low Head Dam Mitigation - Winnebago Dam No. 1
New Construction
Results
Mason City, IA

Animal Care and Adoption Center Catio
Renovation
Post-Bid
Less than $36,000 est. value
Iowa City, IA 52240

Flood Control Levee Repair - 2021
Results
Dubuque, IA

Missouri River Recovery Program - Fawn Island Bank Stabilization
Renovation
Design
$1,000,000 to $5,000,000 est. value
Little Sioux, IA 51545

Reported 07/22/2021 10:58 AM
Project Title

Pedestrian Tunnel To Connect Prairie High School To 155 Acres Of Farm Land

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA   (Linn County)
Category(s) Animal/Plant/Fish Facility, Heavy and Highway
Sub-Category(s) Animal/Plant/Fish Facility, Dam/Tunnel
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Dam/Tunnel, New Construction, 155 Acres, Animal/Plant/Fish Facility, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents