Similar Projects
Nice-Pak Expansion
New Construction - 1,296,000 SF
Conception
$165,000,000 est. value
Mooresville, IN 46158

Concrete Facility
New Construction - 250 SF
Conception
Less than $500,000 CJ est. value
Franklin, IN

L'etoile Apartment Building
New Construction, Build-Out - 108,500 SF
Design
$17,000,000 est. value
Carmel, IN 46032

The Oliver Apartments
New Construction - 8,000 SF
Design
$6,000,000 est. value
Yorktown, IN 47396

Tri-Central Elementary School Administration Addition
Renovation, Addition - 2,476 SF
Bidding
$1,300,000 est. value
Sharpsville, IN 46068

Krannert Park Family Center Renovation
Renovation
Bidding
$5,000,000 est. value
Indianapolis, IN 46241

Placon Corporation
New Construction - 89,371 SF
Post-Bid
Dunlap, IN 46517

New Skatepark
Post-Bid
Greenwood, IN 46143

Central Dispatch Center - Trade Package 23
Renovation - 1,700 SF
Results
Less than $40,000 est. value
Morocco, IN 47963

Network Building and Pretreatment Office
Renovation
Results
Elkhart, IN

MJ Scheutz Headquarters Renovation
Renovation - 21,247 SF
Construction
$2,500,000 to $3,000,000 est. value
Indianapolis, IN 46202

AES Office Building
New Construction - 12,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Zionsville, IN 46077

8th & Oregon Street Mixed Use
New Construction
Pending Verification
$12,000,000 est. value
Lafayette, IN 47901

Multi-Tenant Building
New Construction
Pending Verification
Crown Point, IN 46307

Liberty Estates Mixed Use
New Construction
Conception
$120,000,000 est. value
Merrillville, IN 46410

Last Updated 05/24/2022 01:36 PM
Project Title

McCarty Lane Public Works Campus Phase II

Physical Address View project details and contacts
City, State (County) Lafayette, IN   (Tippecanoe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Park/Playground, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

development services, design services, site work, labor and material to develop and con- struct the project. The campus(s) will likely be con- structed as a pre-engineered metal building(s) with a metal facade, the size of which is still to be determined. The campus building(s) will likely contain of-fice and operating space for parks, fleet, street, and traffic departments, although the final size and usage will be determ-ined in the scoping period. The project will need to consider the adjacent salt storage barn that was constructed in 2020 as Phase 1 of the McCarty Lane Public Works Campus.

Details

Office, New Construction, Warehouse/Storage, New Construction, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents