Similar Projects
BI0020E - Pump Station and Drainage System Cleaning
Renovation, Infrastructure
Bidding
$264,444 est. value
TX

Lovett Industrial Sanitary Lift Station and Force Main
Infrastructure
Bidding
TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Wastewater Improvements
Post-Bid
Ganado, TX 77962

Booster Pump Replacement
Results

Booster Pump Replacement
Results

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Uplands WTP Trident/Office Building and High Service Pump Station Building Renovations
Renovation
Bidding
$1,750,000 to $2,250,000 est. value
Bee Cave, TX

Stormwater Pump Station Pump Replacement
Post-Bid
Sugar Land, TX 77479

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Harkey Road Lift Station to Serve Massey Oaks
New Construction
Bidding
TX

Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

Newport Pointe Lift Station Phase 1
Results
TX

Hawley WSC USDA RD Water System Improvements Phase II CIP-17
Addition
Bidding
$360,000 est. value
TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Last Updated 04/08/2022 11:37 AM
Project Title

COSA Pump Station Covers

Physical Address View project details and contacts
City, State (County) San Angelo, TX   (Coke County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a metal building closures over the water distribution system pump stations. There are two locations where construction will occur. Respondents shall have a minimum of five (5) years’ experience in the construction and installation of similar structures and systems. All construction will be required to be performed while the pump stations are operational, and at no point can the pump stations be taken out of service.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents