Similar Projects
Starbucks - Shell Building / Adel
New Construction, Infrastructure - 2,496 SF
Bidding
$760,000 CJ est. value
Adel, GA 31620

Starbucks - Shell Building / Adel
New Construction, Infrastructure - 2,496 SF
Bidding
$760,000 CJ est. value
Adel, GA 31620

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

MJ Taylor Road Rehabilitation/Resurfacing
Infrastructure
Post-Bid
$260,000 CJ est. value
Adel, GA 31620

Resurfacing and Shoulder Rehabilitation on Valdel Road
Infrastructure
Results
$2,000,000 est. value
Adel, GA 31620

Street Paving and Flood & Drainage Project
Infrastructure
Results
$968,182 CJ est. value
Adel, GA 31620

Emergency Services Radio System Improvements
Infrastructure
Post-Bid
$100,000 CJ est. value
Adel, GA 31620

Streets and Drainage Improvements Revels Avenue and Taylor Street- TIA
Infrastructure
Results
$217,868 CJ est. value
Lenox, GA 31637

Alabama Road Construction Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Adel, GA 31620

Georgia Transportation Infrastructure Bank (Gtib) Project Leveling and Resurfacing Improvements to Brushy Creek Road
Infrastructure
Results
$293,492 CJ est. value
Sparks, GA 31647

Last Updated 12/28/2023 01:33 AM
Project Title

2022 Community Development Block Grant

Physical Address View project details and contacts
City, State (County) Adel, GA 31620   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

road construction project including grading, soil cement base installation, paving, and replacement of driveway aprons and culverts.Time allotted for completion is 150 consecutive calendar days. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents