Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

Lewiston City Sewer System Upgrades
Infrastructure
Bidding
$3,500,000 CJ est. value
Lewiston, UT 84320

SR-23; SR-30 to Idaho Preservation High Volume
Infrastructure
Bidding
$4,000,000 CJ est. value
Cache Jct, UT 84304

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

Construction of the Pitcher Well - House
New Construction, Infrastructure
Post-Bid
$180,000 CJ est. value
Cornish, UT 84308

World-Wide Water Storage Tank Remediation
Term Contract
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

RFP D/B - Providence City Skate Park
Infrastructure
Bidding
$300,000 CJ est. value
Providence, UT 84332

Medhi Heravi Bid Pack 1 - Utah State / Logan
Infrastructure
Post-Bid
$300,000 est. value
Logan, UT 84321

North Valley Landfill Drain Net Installation V2
Infrastructure
Results
$68,020 CJ est. value
Logan, UT 84321

Deep Canyon Trailhead - Cache County
Infrastructure
Pending Verification
$760,000 CJ est. value
Mendon, UT 84325

Last Updated 12/05/2022 09:02 AM
Project Title

1 MG Water Tank and Well Equipping

Physical Address View project details and contacts
City, State (County) Lewiston, UT 84320   (Cache County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,633,737 [brand] Estimate
Plans Available from Civil Engineer - 10/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 5, 2022 project awarded to Spindler Construction for $3,633,737.23. The start date is Jan 1, 2023. The project consists of construction of a concrete water tank, well equipping with building and booster pumps, and modification of an existing well house. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submit questions in writing to Weston Bellon, P.E. - wbellon@jub.com The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Construction of a new 1 MG reinforced concrete water tank, CMU chlorination room addition to an existing well house, new CMU well house, electrical service entrance, heating, backup generator, automatic transfer switch, connection to existing waterline and appurtenances and general site improvements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents