Similar Projects
Last Updated | 03/07/2023 11:33 AM |
Project Title | Acorn Well Pump Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Woodway, TX 76712 (McLennan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,057,148 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Acorn Well Pump Station Improvements consists of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing site includes a water well and above-ground 300,000-gallon storage tank originally constructed in 1985, pumping facilities, electrical equipment, chemical equipment, and hydropneumatic pressure tank. A subsequent improvement project was constructed in 1999 that included upgrades to the pumping and site piping along with a new pressure tank and improvements to the chemical injection system. This proposed project will leave the existing well, ground storage tanks, pumping system, and pressure tank in-place and consolidate all electrical and chemical equipment into a single building with all necessary components as shown on the project drawings and as specified herein. Project will be awarded to proposal providing best value to Owner based on a number of factors including cost, experience of contract, and prior work performance. The deadline to ask questions is 2/27/2023 5:00 PM CST OTHER INFORMATION: . Cost Estimate: $665,000 . Construction Schedule (Anticipated): o Start Date: February 2023 o Substantial Completion Date: 250 Calendar Days per Draft NTP o Readiness for Final payment Date: 280 Calendar Days per Draft NTP Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein. Substantial Completion is 250 calendar days, and the number of days to achieve readiness for final payment is 280 calendar days All questions must be submitted electronically through CivCast's Question and Answer feature. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com. Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |