Similar Projects
5.36 Miles on FAI 55 (I-55), Class A Special Patching from SW of Bloomington to S of Shirley. 0.92 Mile on FAU 6406 (US 150), Class B Patching from Veteran's PKWY to just S of Woodrig Rd. 0.28 Mile on FAP 708 (US 51 BUSN), Class B Patching from US 51 to 0.3 Mile S of US 51
Infrastructure
Bidding

567.5 Miles of Spraying, Approximately 2004 Acres on State Right of Way Along US 51 and Interstate Routes including interchanges
Infrastructure
Bidding

Central Division - Asphalt Paving Maintenance
Post-Bid

Full-Depth Reclamation and Resurf: 200 Ton - Portland Cement
Post-Bid
Lexington, IL 61753

Aggregate Base Preparations And HMA Binder And Surface Courses
Results
Bloomington, IL 61705

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

3P Policy Standard Overlay and Culvert Replacement on Us 24 from Woodford Co Line to Mclean St in Gridley
Infrastructure
Bidding
Gridley, IL

Cemetery Milling & Paving
Renovation
Post-Bid
Bloomington, IL

Repair Parking Lots, Roads and Sidewalks
Results
Less than $900,000 est. value
Normal, IL

Resurfacing on Old 66 fom S of Veterans Parkway to 1.7 Mi SW of Towanda
Infrastructure
Bidding
Towanda, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Non-MFT Road Improvements
Results
Less than $1,066,577 est. value
Bloomington, IL

Resurfacing White Oak Road from US 150 to Locust Street
Infrastructure
Bidding
IL

HMA Resurfacing of Various Streets
Post-Bid
Normal, IL 61761

East Side Drainage Improvements
Results
Gridley, IL 61744

Last Updated 02/21/2022 09:15 AM
Project Title

Meadows Road (CH 23) Road Reconstruction

Physical Address View project details and contacts
City, State (County) IL   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

5.47 Miles; This project consists of reconstruction of CH 23 with HMA Surface and Binder Course on aggregate sub-bases abutted by aggregate shoulders. Other work items includes earthwork, pipe culvert installation and guardrail. Some Items Include: 54,150 Cu Yd - Earth Exc; 83,661 Sq Yd - Geotech Gnd Stb; 188,703 Lbs - Bit Mat'l Prm Ct; 112,543 Lbs - Bit Mat'l Tack Ct; 19,523 Ton - HMA BC IL-19.0 N70; 6,656 Ton - HMA SC IL-9.5 Mix "C" N70; 28,585 Ton - Agg Bse Cse Spl; 28,790 Ton - Agg Bse Cse Ty B; 12,530 Ton - Agg Shld Ty B; 361 Ea - Raised Ref Pvmt Mark; 62,373 Sq Yd - Pvmt Rem; 28,882 Ft - Long Jt Seal; Other Misc Related Items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents