Similar Projects
Traffic Signal Installation and ADA Improvements
Infrastructure
Bidding
Bryn Mawr, PA 19010

SR 0023 and SR 3032 Intersection Improvements, Design Activities Limited To: ADA Curb Ramps
Infrastructure
Bidding
$500,000 to $999,999 est. value
PA

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Salem Township Watts and Walker Road Improvements
Post-Bid
Wayne, PA

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
Collegeville, PA 19426

Plum Street Improvements Phase 7
Infrastructure
Bidding
$50,000 est. value

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Signal Modernization at Dresher Road and Walnut Grove Drive
Infrastructure
Bidding
Horsham, PA 19044

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

2020 Road Projects
Results
Collegeville, PA 19426

Roadway and Bridge Reconstruction
Infrastructure
Post-Bid

ADA Improvements - Bob White and Swedeland Parks
Results
King of Prussia, Wayne, PA 19087

Last Updated 10/28/2021 11:52 AM
Project Title

School Lane Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Stowe, PA   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $223,742
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 2 includes full reconstruction of curbs and roadway, and installation on storm sewer, along School Lane between East Vine Street and Glasgow Street. The project also includes full sidewalk and ramp replacement as alternates.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents