Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Kitchel Lake Filing 3 Infrastructure Project
Infrastructure
Bidding
Timnath, CO

Detention Ponds Improvement Project
Infrastructure
Bidding
$550,000 to $600,000 est. value
Golden, CO

Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

Denver Water - Eleven Mile Reservoir Outflow Flume Replacement
Post-Bid
Denver, CO

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

Culvert Repair and Cleaning
Infrastructure
Bidding
Less than $1,000,000 est. value
Colorado City, Rye, CO

HP and HDPE Storm Drainage Pipe for City Repair Projects
Term Contract
Post-Bid
Pueblo, CO

Chestnut Street to Eastman Park Drive Drainage Improvement Ph 1
Results
Less than $2,174,800 est. value
Windsor, CO 80550

Red Sandstone Creek Culvert Replacement
Term Contract
Bidding
Vail, CO

Goods for Chase Drain
Post-Bid
Castle Rock, CO 80104

Olde Stage Road Slope Stabilization, Wall Construction and Box Culvert Install
Results
CO

PMAA, RMCF, Clear Fork - Campground Redevelopment
Infrastructure
Bidding
Crawford, CO 81415

Yampa River Channel Restoration & Access Design
Post-Bid
Less than $50,000 est. value
Steamboat Springs, CO 80477

Last Updated 08/14/2021 03:07 AM
Project Title

Broadway and 62nd Avenue Minor Drainage Improvements

Physical Address View project details and contacts
City, State (County) Brighton, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project intends to minimize the length of time that water sits on the roadway surface at the southwest corner of Broadway Street (SH 53) and East 62nd Avenue. This includes the installation of a 12-inch storm drainage pipe from southwest corner of the intersection of Broadway Street and East 62nd Avenue and crosses Broadway Street to the east.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents