Similar Projects
Murphy Express #8592
New Construction - 2,800 SF
Conception
Columbia, SC 29201

Buc-ee`s
New Construction - 50,000 SF
Conception
$50,000,000 est. value
Anderson, SC

52 Station
New Construction
Design
Moncks Corner, SC 29430

Spinx #368
New Construction - 4,000 SF
Design
$3,000,000 est. value
Charleston, SC 29414

Raceway #1531- The Retreat / Sumter
New Construction, Infrastructure - 3,500 SF
Bidding
$1,300,000 CJ est. value
Sumter, SC 29150

Raceway #1531- The Retreat / Sumter
New Construction, Infrastructure - 3,500 SF
Bidding
$1,300,000 CJ est. value
Sumter, SC 29150

Caliber Collision and Pep Boys
New Construction
Sub-Bidding
$4,000,000 CJ est. value
Duncan, SC 29334

Caliber Collision and Pep Boys
New Construction
Sub-Bidding
$4,000,000 CJ est. value
Duncan, SC 29334

QuikTrip #1196
New Construction - 7,930 SF
Post-Bid
Graniteville, SC 29829

Mavis Tires & Brakes
New Construction - 6,306 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Columbia, SC 29209

Fueling Station Upfit Project
New Construction
Results
Rock Hill, SC 29732

Murphy Express #8982
New Construction - 2,800 SF
Construction
West Columbia, SC 29169

Murphy Express #8935
New Construction - 2,800 SF
Construction
Columbia, SC 29204

Summerville Nissan
New Construction - 47,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29483

Refuel #1509
New Construction - 6,166 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Beaufort, SC 29906

Last Updated 08/09/2022 01:03 PM
Project Title

SC Gateway Park Meter Station

Physical Address View project details and contacts
City, State (County) Orangeburg, SC 29115   (Orangeburg County)
Category(s) Commercial
Sub-Category(s) Gas Station, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the installation of a 16" check valve, vault and water meter vault, including all related yard piping, process piping, instrumentation, electrical, and site improvements, to serve the SC Gateway development. Questions: If bidders have questions, same shall be directed to the Procurement Director Mode of Communication via e-mail only No later than Monday, June 6, 2022 liquidated damages, the sum of $1,000.00 for each consecutive calendar

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents