Similar Projects
Construction of the Street Crack and Slurry Seal Project
Post-Bid
$250,000 est. value
Centerville, UT 84014

Burke Lane Roadway Project
Post-Bid
Less than $3,000,000 est. value
Farmington, UT 84025

800 North - 2000 West to 3000 West Project
Results
Clinton, UT 84015

2020 Replacement and New Construction of Sidewalk, Curb and Gutter and Storm Drain Facilities at Random Locations
Results
$606,154 est. value
Bountiful, UT 84010

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

2020 Street Maintenance Projects
Post-Bid
Less than $210,000 est. value
UT

West Hill Field Road Sidewalk Improvements, Project
Results
Less than $90,000 est. value
Layton, UT 84041

Construction of the 1200 South Road Project
Post-Bid
Syracuse, UT

DFCM Construction - General Contractors-DWR EWEC Boardwalk and Hasenyager Trail
Results
$140,000 est. value
Farmington, UT 84025

Bonneville Shoreline Design and Construction
Post-Bid
UT

Asphalt Parking Lot Pavement Preventative Maintenance
Results
Farmington, UT 84025

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Post-Bid
$450,000 est. value
Centerville, UT

Micro Seal the Antelope Island Causeway
Results
Fruit Heights, UT 84037

1970 South 1200 West Street Construction Project
Post-Bid
$1,100,000 est. value
Woods Cross, UT 84087

FY 2021 Road Maintenance Project
Results
Farmington, UT 84025

Reported 10/27/2021 12:00 AM
Project Title

500 West 2000 South to D Street Extension, Clearfield

Physical Address View project details and contacts
City, State (County) UT   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000 to $3,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HMA - 1/2 inch Roadway Excavation (Plan Quantity) Concrete Sidewalk

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents