Similar Projects
2022 Gravel Road Program
Infrastructure
Bidding
$110,000 est. value
Glasgow, PA

2022 Road Program
Infrastructure
Bidding
$300,000 est. value
Conway, PA

2020 Roadway Improvement Program
Post-Bid
Midland, PA 15059

Parking Lot Bituminous Repairs at the Expressway Travel Center (ETC) and Rochester Transportation Center (RTC)
Post-Bid
Aliquippa, PA 15001

Roadway and Miscellaneous Repairs
Results

Roadway and Miscellaneous Repairs
Results

2022 Road Projects
Infrastructure
Bidding
$300,000 est. value
New Galilee, PA

Limestone/Seal Bituminous Coat
Post-Bid
Darlington, PA

Geotechnical Maint 40
Results
$1,000,000 to $2,499,999 est. value

2022 Paving Project
Infrastructure
Bidding
$200,000 est. value
Monaca, PA

2021 Road Improvement Program (Liquid Fuels)
Post-Bid
Vanport, PA

Double Seal Bituminous Coating
Results
$62,955 est. value
Darlington, PA

Paving and Parking Lot Improvements
Post-Bid
Beaver, PA 15009

2021 Roadway Improvement Program (Liquid Fuels)
Results
Beaver, PA

2021 Road Paving Program
Post-Bid
$260,000 est. value
New Brighton, PA 15066

Last Updated 06/09/2022 04:44 AM
Project Title

Beaver County Base Repairs 2022

Physical Address View project details and contacts
City, State (County) PA   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project is as follows: For base repair/reconstruction, mechanical patching, milling and resurfacing, drainage, guide rail, and other miscellaneous construction, all within a length of 82,686 linear feet (15.66 miles) as indicated on the approved drawings included in the bid package for BEAVER GROUP 112-22-7135-2 in BEAVER COUNTY, NEW SEWICKLEY TOWNSHIP, OHIOVILLE BOROUGH, and BRIGHTON TOWNSHIP, BEAVER COUNTY, Commonwealth of Pennsylvania. This project being situated as follows: SR 2006, Section B06 (Lovi Road) - From the intersection with SR 2018 (Lovi Road/Freedom Crider Road) at Segment 0010 Offset 0000 to the intersection with SR 2004 (Freedom Crider Road) at Segment 0100 Offset 1869. SR 1028, Section B04 (Big Knob Road) - From the intersection with SR 68 (Sunflower Road) and SR 1024 (Deer Lane Ext.) at Segment 0010 Offset 0000 to the intersection with SR 0989 (Wallace City Road) at Segment 0060 Offset 3268. SR 4028, Section B05 (Tuscarawas Road) - From the intersection with SR 168 (Tuscarawas Road and Fairview Road) at Segment 0010 Offset 0000 to approximately 950 feet East of the intersection with Coleman Drive at Segment 0110 Offset 2512. Various State Routes and Facilities throughout Beaver County for unforeseen repair and/or resurfacing, as directed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents