Similar Projects
Install JPCP(RSC), LCB Rapid Setting, Class 3 AB, Slab Replacement
Infrastructure
Bidding
$120,000,000 est. value
Palmdale, CA 93550

CIDH Piles, Excavation, Rock Slope Protection, and Bridge Removal
Infrastructure
Bidding
$8,800,000 est. value
Santa Rosa, CA

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Post-Bid
$76,000,000 est. value
Olancha, CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Realign Curve and Replace Culverts
Infrastructure
Bidding
$7,600,000 est. value
Bella Vista, CA 96008

American River Common Features 2016 Erosion Protection Project
Term Contract
Post-Bid
Sacramento, CA 95814

Bridge Seismic Retrofit and Rock Slope Protection
New Construction, Infrastructure
Results
$8,100,000 est. value
CA

Constructing Retaining Wall and Confinement System to Restore Slipout
Infrastructure
Bidding
$13,200,000 est. value
Jenner, CA 95450

Hannah Ranch Check Structure
Infrastructure
Post-Bid
Farmersville, CA

Construct Soldier Pile Wall
Infrastructure
Results
$1,750,000 est. value
CA

Los Vaqueros Reservoir Expansion Project Transfer Pipeline Inspection - Phase 2
Infrastructure
Bidding
$900,000 est. value
Brentwood, CA 90049

Construct Retaining Wall, Culvert and Place HMA
Infrastructure
Post-Bid
$13,600,000 est. value
Butte Valley, CA

Import Borrow, Jack Welded and Corrugated Steel Pipe
Infrastructure
Results
$1,730,000 est. value
CA

Last Updated 06/13/2022 12:04 AM
Project Title

Mcnears Beach Slope Repair

Physical Address View project details and contacts
City, State (County) San Rafael, CA 94901   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $316,650
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

McNears Beach Slope Repair project occurs at the McNears Beach Park at 201 Cantera Way, San Rafael, CA. The project will stabilize earth movement which occurred in February of 2017. The project includes installation of a soldier pile wall comprised of 13 steel I-beams, wood lagging and subdrain system. The project will also include site grading including contouring of fill and finish slope upslope of soldier pile wall.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents