Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Urbana Middle School Chiller Replacements
Renovation
Sub-Bidding
$850,000 CJ est. value
Urbana, IL 61801

Complete Multi-Zone Heating and Cooling System
Renovation
Sub-Bidding
$100,000 CJ est. value
Greenville, IL 62246

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Westview Elementary School - HVAC Modifications
Renovation
Sub-Bidding
$440,000 CJ est. value
Champaign, IL 61821

Evergreen Park Public Library - HVAC Replacement
Alteration
Post-Bid
Evergreen Park, IL 60805

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

Weatherization (IHWAP) Program
Term Contract
Post-Bid

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Replacement and Toilet Room Remodeling
Renovation, Alteration
Post-Bid
Norridge, IL 60706

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Roofing Plumbing Sewer Electrical
Infrastructure
Post-Bid
Cicero, IL

Last Updated 01/26/2023 04:33 PM
Project Title

Boiler Replacement Peoria Players Theatre

Physical Address View project details and contacts
City, State (County) Peoria, IL 61614   (Peoria County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $179,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 7/26/2022 no award has been made. A timeline for the award has not yet been established. For Boiler Replacement Peoria Players Theatre A list of planholders can be obtained upon request. This information will be available up to twenty-four (24) hours prior to the scheduled bid opening time. After that deadline, no information pertaining to the project will be given. A 10% Bid Bond is required, and is to be included with the Bid Proposal. The successful Bidder will be required to furnish a 100% Performance Bond and a 100% Labor and Materials Payment Bond within ten (10) days of formal Award of Contract. Per owner all bids were rejected, and this project will re-bid at a a future time and date TBD. The general prevailing rate of wage for the Peoria area shall be paid for each craft or type of worker needed to execute this contract or perform this work as required by the State of Illinois Department of Labor. Additionally, it is required that provisions of the Illinois Preference Act, the Illinois Drug Free Workplace Act, and the Substance Abuse Prevention on Public Works Act must be adhered to. Bidders are also advised that contract documents for this project include the non-discrimination, equal opportunity and affirmative action provisions in the Human Rights Act and rules and regulations of the Department of Human Rights. The Peoria Park District is an AA/EEO organization and encourages participation by minority and female-owned firms. The Peoria Park District reserves the right to reject any or all bids, waive technical deficiencies, informalities or irregularities or rebid any project. It is a goal of the Peoria Park District to encourage 12% participation of minorities and women on Peoria Park District construction projects through contracts and workforce

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents