Similar Projects
Simms Technology Park
New Construction - 577,340 SF
Conception
$10,000,000 CJ est. value
Broomfield, CO 80023

Colorado Research Exchange (CoRE)
New Construction - 465,960 SF
Design
$60,000,000 est. value
Broomfield, CO 80021

Zuni Street and Quail Creek Drive Roundabout - 18K0003 - City and County of Broomfield
Infrastructure
Design
$625,000 CJ est. value
Broomfield, CO 80023

Southlands Public Infrastructure Improvements
Infrastructure
Bidding
$6,500,000 CJ est. value
Broomfield, CO 80023

Southlands Public Infrastructure Improvements
Infrastructure
Bidding
$6,500,000 CJ est. value
Broomfield, CO 80023

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

104th Street Trail Connection Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Broomfield, CO 80020

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1st Avenue and Sheridan Boulevard Intersection Improvements
Results
Less than $400,000 est. value
Broomfield, CO 80234

Broomfield Monitoring Wells
Infrastructure
Bidding
$70,000 CJ est. value
Broomfield, CO 80020

West 11th Avenue Court Reconstruction
Infrastructure
Results
$250,000 est. value
Broomfield, CO 80020

East Sheridan Residential Phase 1 (1A-1C) Public Landscape Improvements
Infrastructure
Bidding
$150,000 CJ est. value
Broomfield, CO 80023

Broadlands Lane Reconstruction
Infrastructure
Results
$657,000 est. value
Broomfield, CO 80023

RFQ Engineering - Broomfield Heights Stormwater and Pedestrian Improvements
Infrastructure
Bidding
$800,000 CJ est. value
Broomfield, CO 80020

Zuni Street and Quail Creek Drive Roundabout
Infrastructure
Results
Less than $670,000 est. value
Broomfield, CO 80023

Last Updated 08/10/2022 01:08 PM
Project Title

Dutch Brothers Coffee / Thornton

Physical Address View project details and contacts
City, State (County) Thornton, CO 80023   (Broomfield County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2019
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2018, the project has been submitted to the city of Thornton for plan review. Information regarding the method of contractor selection has not been determined at this time. Although a firm timeline for construction has not been determined, construction is estimated to begin second quarter 2019. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 824 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents