Similar Projects
Slope Stabilization Material
Post-Bid
Conshohocken, PA 19428

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Klingerman Road Culvert Replacement
Term Contract
Results
PA

Wynnewood Valley Park Stream Restoration and Bank Stabilization
Results
$450,000 to $750,000 est. value
Ardmore, PA 19003

Harriton Park Stream Restoration
Results
$450,000 to $750,000 est. value
Ardmore, PA 19003

Design, Manufacture, Storage and Delivery of an Aluminum Box Culvert with Headwalls and Wingwalls
Results
Kulpsville, PA 19443

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Ardsley Wildlife Sanctuary - Regenerative Step Pool Storm Conveyance Swale
Results
$80,000 to $85,000 est. value
Abington, PA 19001

Slope Repair I-76 E.B. - Design Activities Limited To: Roadway, Traffic Control, and Right of Way
Results
$1,000,000 to $2,499,999 est. value
PA

Newman Road Culvert Replacement
Results
Less than $150,000 est. value
Pennsburg, PA 18073

Road Overlay and Drainage Project
Results
East Norriton, PA

Whites Road Park Streambank Restoration Project
Results
Lansdale, PA 19446

Eaton Memorial Park Streambank Restoration and Stabilization
Results
Hatboro, PA 19040

PA320 Hanging Rock
Results
$7,500,000 to $9,999,999 est. value
PA

Aronimink Retaining Wall Replacement
Results
$90,000 to $115,000 est. value
Limerick, PA 19468

Last Updated 02/10/2020 11:22 AM
Project Title

Rittenhouse Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) Lansdale, PA 19446   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $110,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the removal of an existing 8’ wide x 4’ high stone arch culvert, including endwalls and replacement with 31’-6” linear feet of 9’-2” span x 3’-3” rise aluminum box culvert with aluminum headwalls and wingwalls. The new aluminum box culvert with headwalls and wingwalls will be furnished by the Township for installation under this Contract. Also included is the relocation of approximately 64 linear feet of 16” ductile iron pipe water main, including all appurtenances. Construction will occur in a Township road and in temporary construction easement areas, and will include all required demolition and restoration work, stream channel grading modifications, along with provisions for all necessary erosion and sedimentation controls.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents