Similar Projects
New Parking Lot and Replacement
Infrastructure
Bidding
Statesville, NC

Old Cherokee Roadway Improvements
Infrastructure
Bidding

Replace and Install Ada Ramps and Handrails
Post-Bid
Statesville, NC 28677

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Langtree Campus Drive at Transco Road
Results
Less than $1,701,644 est. value
Mooresville, NC 28117

Briarcliff Road Area Sidewalk Improvements
Results
Less than $4,779,750 est. value
Mooresville, NC

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Paving and Road Repairs - Mooresville Transfer Station
Results
$148,572 est. value
Mooresville, NC 28115

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

2021 Street Resurfacing Project
Results
$1,200,000 est. value
Mooresville, NC 28115

Stumpy Creek Paving Project
Results
Mooresville, NC 28117

West Wilson Roadway Improvements
Results
$4,300,000 est. value
Mooresville, NC 28117

East Corporate Area Development Phase 1 Project
Results
Statesville, NC 28687

Grading, Drainage, Paving and Structures
Results
NC

2021 Curb Replacement
Results
Mooresville, NC 28115

Last Updated 05/18/2021 02:34 PM
Project Title

Repair of the Rear Parking Lot Located on Main Campus

Physical Address View project details and contacts
City, State (County) Statesville, NC 28677   (Iredell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of the rear parking lot located on the Main Campus. The address to this location is known as 500 West Broad Street, Statesville, NC 28677. The services needed will consist of asphalt patch, cleaning and filling cracks, apply two coats of sealant and stripe/paint as existing. These services must be completed no later than July 16th, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents