Similar Projects
2022 Street Improvements (2022-1 CCMG Funding) Parts 1 and 2
Infrastructure
Bidding
$300,000 est. value
Roanoke, IN

2022 Street Improvements (2022-1 CCMG Funding) Parts 1 and 2
Infrastructure
Bidding
$300,000 est. value
Roanoke, IN

2021 Huntington County Community Crossing
Post-Bid
Huntington, IN

2021 Street Improvements Phase 1A,1B,1C, 2,3
Post-Bid
Markle, IN

Steel Pipe
Infrastructure
Results

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Roche Street Reconstruction
Post-Bid
$200,000 to $275,000 est. value
Huntington, IN

Concrete Pavement Restoration
Infrastructure
Results
IN

CCMG McKeever Street Improvements
Post-Bid
Less than $262,275 est. value
Andrews, IN 46702

Corrugated Pipe for Dale Subdistrict
Infrastructure
Results

West Lamont Road, Cul-De-Sac Road Construction
Post-Bid
Huntington, IN 46750

Street Improvement
Infrastructure
Results
Roanoke, IN 46783

2021 Street Paving
Infrastructure
Post-Bid
Huntington, IN

Corrugated Pipe For Washington Subdistrict
Infrastructure
Results

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Reported 07/19/2022 12:00 AM
Project Title

Tipton Street Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Huntington, IN 46750   (Huntington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work shall consist of the widening the asphalt travel lanes, guardrail removal, guardrail installation, and a compacted aggregate stone shoulder. The project length is approximately 3,860 linear feet of roadway. It will also consist of extending the existing 48-inch drainage culvert under Tipton Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents